TEXAS · WELLS · JACKSON COUNTY · API 42-239-02735 · DISTRICT 02
West Ranch -A- #388
Jackson County · West Ranch (Greta) field · Vertical
West Ranch -A- #388 (API 42-239-02735) is a plugged well in Jackson County, plugged January 19, 2017, last operated by Hilcorp Energy Company.
The RRC has issued one drilling permit, issued May 25, 1990, permitted to 5,852 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Its 4 leases have reported 17.2M barrels of oil and 8.4M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 688 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Mobil Producing TX. & N.M. Inc.May 25, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,852
- total depth, ft
- 1
- permits on file
- May 25, 1990
- last permit issued
- Jun 23, 1994
- completed
- 17.2M
- cumulative oil, bbl
- 8.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 23, 1994
- Shut in
- —
- Plugged
- Jan 19, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 688 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | 287 | 6M | 5.64M | Jan 1993 – Apr 2026 |
| West Ranch (41-a/98-a Cons) Unit O-2-11296 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | 253 | 9.11M | 7.69K | Jul 2016 – Apr 2026 |
| West Ranch -A- O-2-10962 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | 82 | 51K | 36.9K | Feb 2015 – Jun 2016 |
| West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | 66 | 2M | 2.71M | Jan 1993 – Jan 2015 |
Oil, barrels lease total
Last 12 months 858,307 · prior 12 963,567(-11%)
Gas, mcf lease total
Last 12 months 27,020 · prior 12 53,020(-49%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
- 2Meridian Oil Inc.Mar 1996 → Jul 1996
- 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
- 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
- 5Vintage Petroleum, LLCMay 2006 → Jul 2007
- 6Hilcorp Energy CompanyAug 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373831-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 25, 1990 | May 25, 1990 | — | 5,852 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 23, 1994 | West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | Plugged | — |
| Jun 22, 1990 | West Ranch (41-a/98-a Cons) Unit O-2-11296 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | Plugged | — |
| Jun 22, 1990 | West Ranch -A- O-2-10962 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | Plugged | — |
| Jun 22, 1990 | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Plugged | — |
| Nov 5, 1987 | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Plugged | — |
| Jan 10, 1980 | West Ranch -A- O-2-2133 | West Ranch (Venado Zone) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| — | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,095 | 5,108 | Perforated |
| 5,097 | 5,107 | Perforated |
| 5,714 | 5,725 | Perforated |
| 5,716 | 5,728 | Perforated |
| 5,718 | 5,728 | Perforated |
| 5,720 | 5,729 | Perforated |
| 5,810 | 5,818 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,321 | — | 500 S |
| 2.375 | 5,667 | — | — |
| 7 | 5,852 | — | 500 S |
| 2.375 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 2017 | Jul 23, 1990 | — |
| 00 | May 26, 2015 | Jul 23, 1990 | — |
| 00 | Feb 23, 1995 | Nov 21, 1994 | — |
| 00 | Nov 6, 1990 | Jul 23, 1990 | Yes |
| 00 | Oct 3, 1990 | Jul 23, 1990 | — |
| 00 | Aug 10, 1990 | Dec 14, 1987 | — |
| 00 | Aug 10, 1990 | — | — |
| 00 | Jan 20, 1988 | Dec 14, 1987 | — |
| 00 | Nov 16, 1987 | Oct 22, 1987 | — |
| 00 | Dec 29, 1986 | Dec 17, 1986 | — |
| 00 | Jun 7, 1984 | Nov 17, 1983 | — |
| 00 | Jan 12, 1984 | Nov 17, 1983 | — |
| 00 | Jan 12, 1984 | Feb 15, 1980 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-02735 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-02735 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23902735, documented in the API reference.