WELL · 42-239-02762 · DISTRICT 2
West Ranch -A- #415
Jackson County · Vertical
West Ranch -A- #415 (API 42-239-02762) is a permitted well in Jackson County filed by Hilcorp Energy Company; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1979 and 2015, permitted to 5,850 ft.
Completion filings report 3 formation tops, including Catahoula, Frio, Greta.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Hilcorp Energy CompanyApr 10, 2015 |
- 5,850
- total depth, ft
- 4
- permits on file
- Apr 10, 2015
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Ranch -A- G-2-281486 | West Ranch (80-A) | Hilcorp Energy Company | 1 | 0 | 0 | Aug 2015 – Jul 2026 |
| West Ranch 'A' G-2-150476 | West Ranch (Noble) | Hilcorp Energy Company | 1 | 0 | 0 | Aug 1994 – Aug 2015 |
| West Ranch "A" G-2-83485 | West Ranch (Marginulina 5000) | Meridian Oil Production Inc. | 1 | 0 | 0 | Jan 1993 – Jul 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 805069-99 | Recompletion | Hilcorp Energy Company | Mar 27, 2015 | Apr 10, 2015 | Jul 13, 2015 | 5,848 |
| 426583-99 | Recompletion | Meridian Oil Production Inc. | Aug 3, 1994 | Aug 3, 1994 | Jun 28, 1994 | 5,339 |
| 302536-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 21, 1986 | May 23, 1986 | — | 5,339 |
| 50583-99 | Recompletion | Mobil Oil Corporation | Jun 12, 1979 | Jun 12, 1979 | — | 5,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-83485 | — | — | — | — |
| — | — G-2-150476 | — | — | — | — |
| — | — G-2-281486 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 18 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,955 | 2,995 | Perforated |
| 4,976 | 4,986 | Perforated |
| 5,102 | — | Perforated |
| — | 5,715 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,359 | 15 | 650 S |
| 7 | 5,848 | 9.875 | 1,250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 14, 2016 | Jul 4, 2016 | — |
| 00 | Aug 24, 1994 | — | — |
| 00 | Jan 12, 1984 | Oct 22, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-02762 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-02762 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23902762, documented in the API reference.