TEXAS · WELLS · JACKSON COUNTY · WEST RANCH -A- LEASE · API 42-239-02782 · DISTRICT 02

West Ranch -A- #435

Plugged

Jackson County · West Ranch (Greta) field  · Vertical

West Ranch -A- #435 (API 42-239-02782) is a plugged well in Jackson County, plugged July 17, 1997, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 1984 and 1987, permitted to 5,750 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 6M barrels of oil and 5.64M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 287 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitMobil Producing TX. & N.M. Inc.Jul 16, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,750
total depth, ft
2
permits on file
Jul 16, 1987
last permit issued
Jan 11, 1988
completed
6M
cumulative oil, bbl
5.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 11, 1988
Shut in
—
Plugged
Jul 17, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 287 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy Company2876M5.64MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 74,228 · prior 12 84,801(-12%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 27,020 · prior 12 53,020(-49%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
332824-99RecompletionMobil Producing TX. & N.M. Inc.Jul 13, 1987Jul 16, 1987—5,750
250846-99RecompletionMobil Producing TX. & N.M. Inc.Aug 31, 1984Sep 10, 1984—5,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 11, 1988West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—
Aug 16, 1984West Ranch -A- O-2-1677West Ranch (Ward)Hilcorp Energy CompanyPlugged—
Aug 30, 1979West Ranch -A- O-2-3207West Ranch (Toney)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-1677West Ranch (Ward)Hilcorp Energy CompanyPlugged—
—West Ranch -A- O-2-3207West Ranch (Toney)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,2355,250Perforated
5,2775,292Perforated
5,5285,548Perforated
5,7305,740Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,323——
10.751,329——
10.751,34115732 S
2.3755,506——
75,7859.625609 S
75,785——
10.75———
7———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 22, 1988Jan 22, 1988—
00Dec 15, 1987Nov 16, 1987—
00Dec 5, 1987——
00Nov 26, 1984Nov 7, 1984—
00Nov 15, 1984——
00Jan 12, 1984Sep 24, 1979—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.61M
bbl, last 12 reported months
14.7M
bbl, all reported
Jun 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000053705H-1 InjectionPlugged Aug 7, 1997005,730–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,605,644 · prior 12 1,720,610(-7%)

0100K200K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23902782, documented in the API reference.