WELL · 42-239-03499 · DISTRICT 2

Toney, M. H., Mrs. #82 D

N

Jackson County  · Vertical

Toney, M. H., Mrs. #82 D (API 42-239-03499) is a permitted well in Jackson County filed by Exxon Corp.; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1978 and 1986, permitted to 6,200 ft.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta.

Its 3 leases have reported 8.04K barrels of oil and 23.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Corp.

Based in
Houston, TX
P-5 status
See remarks (S)
P-5 last filed
Mar 15, 1999
Permits on file
19,549
Phone
(713) 431-1125

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Jan 2011
Latest permitExxon Corp.Nov 27, 1986
6,200
total depth, ft
4
permits on file
Nov 27, 1986
last permit issued
—
completed
8.04K
cumulative oil, bbl
23.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Toney, M. H., Mrs. G-2-253229West Ranch (Toney)Hilcorp Energy Company100Nov 2007 – Jul 2026
Toney, M. H., Mrs. O-2-1670West Ranch (Ward)Hilcorp Energy Company38.04K21.1KJan 1993 – Jul 2026
Toney, M.H. Mrs. G-2-246936West Ranch (Ward)Hilcorp Energy Company101.97KFeb 2009 – Apr 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Dec 1993
  2. 2Meridian Oil Production Inc.Jan 1994 → Aug 1994
  3. 3Vintage Petroleum, Inc.Oct 2002 → Sep 2005
  4. 4Hilcorp Energy CompanyApr 2008 → Jan 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
345407-99RecompletionExxon Corp.Apr 19, 1988Nov 27, 1986Jul 22, 19886,200
279622-99RecompletionExxon Corp.Jun 17, 1985Jul 3, 1985—6,200
51226-99RecompletionExxon Corp.Jun 8, 1979Jun 8, 1979—6,200
26583-99RecompletionExxon Corp.Jun 15, 1978Jun 15, 1978—6,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-246936————
—— G-2-253229————
—— O-2-1670————

Formation tops

As filed on W-2/G-1. Subsea from 3 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,261-4,258
Frio5,000-4,997
Gretta5,102-5,099

Perforations

Perforated and open-hole intervals.

FromToType
5,4365,440Perforated
5,4565,463Perforated
5,7085,714Perforated
5,9045,908Perforated
5,9906,004Perforated
6,0086,020Perforated
—5,744Perforated
—6,107Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,33612.25528 S
8.6251,33614—
8.6251,34614—
1.55,062——
2.8756,2007.875375 S
2.8756,200—375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 4, 2019Nov 15, 2017—
00Jun 22, 2010Dec 29, 2009—
00Mar 11, 2010Sep 23, 2009Yes
00Dec 8, 2009——
00Jun 4, 2009Feb 25, 2009—
00May 11, 2009——
00Jan 13, 1986Dec 13, 1985Yes
00Jan 12, 1984Jan 24, 1983—
00Jan 12, 1984Sep 25, 1975—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23903499, documented in the API reference.