TEXAS · WELLS · JACKSON COUNTY · API 42-239-20280 · DISTRICT 02

Vanderbilt State #27

Plugged

Jackson County · West Ranch (Toney) field  · Vertical

Vanderbilt State #27 (API 42-239-20280) is a plugged well in Jackson County, plugged May 25, 1988, last operated by Meridian Oil Production Inc..

The RRC has issued 6 drilling permits between 1978 and 1984, permitted to 5,881 ft.

It was permitted by Exxon Corp. and has since transferred to Meridian Oil Production Inc. on the wellbore schedule.

Operator of record

Meridian Oil Production Inc.

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 29, 2016
Permits on file
253
Phone
(713) 624-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMeridian Oil Production Inc.
Production reportsnone
Latest permitExxon Corp.Jul 23, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,881
total depth, ft
6
permits on file
Jul 23, 1984
last permit issued
Sep 25, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 25, 1984
Shut in
—
Plugged
May 25, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
247514-99RecompletionExxon Corp.Jul 10, 1984Jul 23, 1984—5,881
147796-99RecompletionExxon Corp.Jan 6, 1982Jan 6, 1982—5,880
147794-99RecompletionExxon Corp.Jan 6, 1982Jan 6, 1982—5,880
90096-99RecompletionExxon Corp.Jun 23, 1980Jun 23, 1980—5,881
63800-99RecompletionExxon Corp.Nov 2, 1979Nov 2, 1979—5,881
34076-99RecompletionExxon Corp.Sep 6, 1978Sep 6, 1978Dec 15, 19785,881

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 25, 1984Vanderbilt State O-2-4897West Ranch (Toney)Meridian Oil Production Inc.Plugged—
Sep 25, 1984Vanderbilt State O-2-4897West Ranch (Toney)Meridian Oil Production Inc.Plugged—
Apr 9, 1982Vanderbilt State O-2-4954West Ranch (Mitchell)Exxon Corp. - HoustonPlugged—
Aug 29, 1980Vanderbilt State O-2-4954West Ranch (Mitchell)Exxon Corp. - HoustonPlugged—
Nov 1, 1968Vanderbilt State G-2-66656West Ranch (Ward)Exxon Corp. - HoustonPlugged—
—Vanderbilt State O-2-1671West Ranch (Ward)Hilcorp Energy CompanyPlugged—
—West Ranch Glasscock Sand Unit O-2-4196West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—
—West Ranch Glasscock Sand Unit O-2-4196West Ranch (Glasscock)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
5,4045,410Perforated
5,4455,452Perforated
5,5965,612Perforated
5,6545,661Perforated
5,6875,700Perforated
5,7445,781Perforated
5,7745,781Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,33612.25450 S
8.6251,33712.25450 S
1.55,321——
1.55,332——
1.55,590——
2.8755,8806.25250 S
2.8755,8807.875250 S
2.8755,880——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 10, 1984Nov 5, 1984—
00Jan 12, 1984Jun 10, 1983—
00Jan 12, 1984Apr 26, 1982—
00Jan 12, 1984Nov 20, 1980—
00Jan 12, 1984Sep 15, 1967—
00Jan 12, 1984Aug 24, 1967—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23920280, documented in the API reference.