WELL · 42-239-30324 · DISTRICT 2
Simicek B. #6
Jackson County · Mayo field · Vertical
Simicek B. #6 (API 42-239-30324) is a well in Jackson County operated by Sue-Ann Operating L.C., completed February 10, 1973.
The RRC has issued one drilling permit, issued April 19, 2000, permitted to 6,650 ft.
Completion filings report 4 formation tops, including 3700', 3700 A, Marg, Ganado Shallow.
Its 2 leases have reported 15.8K barrels of oil and 23.7K mcf of gas since January 1993, last reporting in February 2001. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Active (A)
- P-5 last filed
- May 8, 2026
- Permits on file
- 380
- Phone
- (361) 576-6090
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sue-Ann Operating L.C. |
| Production reports | Sue-Ann Operating, L.C.through Jul 2000 |
| Latest permit | Sue-Ann Operating, L.C.Apr 19, 2000 |
- 6,650
- total depth, ft
- 1
- permits on file
- Apr 19, 2000
- last permit issued
- Feb 10, 1973
- completed
- 15.8K
- cumulative oil, bbl
- 23.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 10, 1973
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Simicek, B G-2-178484 | Ganado (3900) | Sue-Ann Operating, L.C. | 1 | 0 | 8.89K | May 2000 – Feb 2001 |
| Simicek, B. O-2-1045 | Mayo | Sue-Ann Operating, L.C. | 1 | 15.8K | 14.8K | Jan 1993 – Nov 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sue-Ann Production CompanyJan 1993 → Jun 1999
- 2Shell Western E&P Inc.Sep 1995 → Nov 1996
- 3Sue-Ann Operating, L.C.Jul 1999 → Jul 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 494198-99 | Recompletion | Sue-Ann Operating, L.C. | Apr 18, 2000 | Apr 19, 2000 | May 15, 2000 | 6,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-178484 | — | — | — | — |
| — | — O-2-1045 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 55 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 3700' | 3,710 | -3,655 |
| 3700 A | 3,738 | -3,683 |
| Marg | 5,080 | -5,025 |
| Ganado Shallow | 5,120 | -5,065 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,854 | 3,860 | Perforated |
| 5,318 | 5,333 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,818 | 15 | 800 S |
| 4.5 | 6,647 | 9.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2000 | Jun 5, 2000 | — |
| 00 | Sep 13, 2000 | — | — |
| 00 | Jan 12, 1984 | Feb 23, 1973 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-30324 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-30324 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23930324, documented in the API reference.