TEXAS · WELLS · JACKSON COUNTY · API 42-239-31251 · DISTRICT 02

West Ranch A #486

Plugged

Jackson County · West Ranch (Marginulina 5000) field  · Vertical

West Ranch A #486 (API 42-239-31251) is a plugged well in Jackson County, plugged January 30, 2017, last operated by Hilcorp Energy Company.

The RRC has issued 3 drilling permits (amended once) between 1978 and 1991, permitted to 6,231 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its 2 leases have reported 6M barrels of oil and 5.64M mcf of gas since January 1993, last reporting in July 2026. The leases carry 288 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitMobil Producing TX. & N.M. Inc.Feb 11, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,231
total depth, ft
4
permits on file
Feb 11, 1991
last permit issued
Aug 11, 1992
completed
6M
cumulative oil, bbl
5.64M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 11, 1992
Shut in
—
Plugged
Jan 30, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 288 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy Company2876M5.64MJan 1993 – Jul 2026
West Ranch "A" G-2-142732West Ranch (Marginulina 5000)Hilcorp Energy Company100Jan 1993 – Jan 2017

Oil, barrels lease total

Last 12 months 74,228 · prior 12 84,801(-12%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 27,020 · prior 12 53,020(-49%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
384308-98RecompletionMobil Producing TX. & N.M. Inc.May 28, 1992Feb 11, 1991Aug 6, 19926,229
384308-99RecompletionMobil Producing TX. & N.M. Inc.Feb 6, 1991Feb 11, 1991—6,229
362121-99RecompletionMobil Producing TX. & N.M. Inc.Jul 31, 1989Jul 31, 1989—6,231
18582-99DrillMobil Oil CorporationFeb 7, 1978Feb 7, 1978—6,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 11, 1992West Ranch A G-2-142732West Ranch (Marginulina 5000)Hilcorp Energy CompanyPlugged—
May 14, 1991West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyPlugged—
Aug 11, 1988West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,9624,968Perforated
5,0805,104Perforated
5,0845,086Perforated
5,7055,711Perforated
5,7055,740Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,33014.75750 S
10.751,33614.75750 S
10.751,336——
2.3755,679——
76,2299.8751,080 S
76,229——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1993Sep 16, 1992Yes
00Nov 3, 1992——
00Sep 27, 1991Sep 11, 1991—
00Dec 19, 1989Oct 18, 1989Yes
00Nov 21, 1989——
00Oct 6, 1988Aug 23, 1988—
00Aug 23, 1984Jul 25, 1984—
00Jan 12, 1984Jul 25, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083970H-1 InjectionPlugged Feb 9, 201725,0002,0005,175–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23931251, documented in the API reference.