TEXAS · WELLS · JACKSON COUNTY · API 42-239-31483 · DISTRICT 02
Blankenship Gas Unit #3
Jackson County · Morales (3480) field · Vertical
Blankenship Gas Unit #3 (API 42-239-31483) is a plugged well in Jackson County, plugged December 14, 1988, last operated by Txo Production Corp..
The RRC has issued 6 drilling permits between 1980 and 1988, permitted to 4,812 ft.
Completion filings report one formation top, including Frio.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1990
- Permits on file
- 3,227
- Phone
- (214) 954-2086
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | TXO Production Corp.Feb 17, 1988 |
- 4,812
- total depth, ft
- 6
- permits on file
- Feb 17, 1988
- last permit issued
- Dec 21, 1987
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 21, 1987
- Shut in
- —
- Plugged
- Dec 14, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 342622-99 | Recompletion | TXO Production Corp. | Feb 12, 1988 | Feb 17, 1988 | — | 4,812 |
| 335776-99 | Recompletion | TXO Production Corp. | Sep 11, 1987 | Sep 16, 1987 | — | 4,812 |
| 278099-99 | Recompletion | TXO Production Corp. | May 8, 1985 | Jun 19, 1985 | — | 4,812 |
| 251771-99 | Recompletion | TXO Production Corp. | Sep 17, 1984 | Sep 18, 1984 | — | 4,812 |
| 213754-99 | Recompletion | TXO Production Corp. | Feb 29, 1984 | Sep 22, 1983 | — | 4,812 |
| 71865-99 | Drill | Texas Oil & Gas Corp. | Feb 6, 1980 | Feb 6, 1980 | — | 4,812 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 21, 1987 | Blankenship Gas Unit G-2-126557 | Morales (3480) | TXO Production Corp. | Plugged | — |
| Mar 13, 1985 | Blankenship Gas Unit G-2-116957 | Morales (3600) | TXO Production Corp. | Plugged | — |
| Jan 6, 1985 | Blankenship Gas Unit G-2-114414 | Morales (3670) | TXO Production Corp. | Plugged | — |
| Feb 3, 1984 | Blankenship G. U. G-2-109337 | Morales (3840) | TXO Production Corp. | Plugged | — |
| Oct 3, 1980 | Blankenship Gas Unit G-2-90973 | Morales (Frio M-3 N) | TXO Production Corp. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 100 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,478 | 3,483 | Perforated |
| 3,599 | 3,604 | Perforated |
| 3,675 | 3,677 | Perforated |
| 3,837 | 3,840 | Perforated |
| 4,002 | 4,004 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 455 | 12.25 | 300 S |
| 8.625 | 544 | 12.25 | 300 S |
| 2.875 | 4,207 | 7.875 | 1,110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 14, 1988 | Jan 7, 1988 | Yes |
| 00 | Mar 9, 1988 | — | — |
| 00 | Jul 9, 1985 | Mar 27, 1985 | — |
| 00 | Jun 29, 1985 | — | — |
| 00 | Feb 1, 1985 | Jan 15, 1985 | — |
| 00 | Jan 19, 1985 | Jan 7, 1985 | — |
| 00 | Apr 2, 1984 | Feb 27, 1984 | — |
| 00 | Mar 16, 1984 | Feb 27, 1984 | — |
| 00 | Jan 12, 1984 | Oct 14, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-31483 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-31483 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23931483, documented in the API reference.