TEXAS · WELLS · JACKSON COUNTY · API 42-239-31619 · DISTRICT 02

West Ranch -A- #291 D

Plugged

Jackson County · West Ranch (Other Zones) field  · Vertical

West Ranch -A- #291 D (API 42-239-31619) is a plugged well in Jackson County, plugged July 14, 1987, last operated by Hilcorp Energy Company.

The RRC has issued one drilling permit, issued May 15, 1981, permitted to 5,665 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsnone
Latest permitMobil Producing TX. & N.M. Inc.May 15, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,665
total depth, ft
1
permits on file
May 15, 1981
last permit issued
Jun 10, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 10, 1981
Shut in
—
Plugged
Jul 14, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
118287-99RecompletionMobil Producing TX. & N.M. Inc.May 15, 1981May 15, 1981—5,665

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1981West Ranch -A- O-2-1661West Ranch (Other Zones)Hilcorp Energy CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
4,4004,425Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,335——
2.8754,375——
5.56,200——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 22, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

415K
bbl, last 12 reported months
2.3M
bbl, all reported
Dec 1984
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000040243W-14 DisposalPlugged Sep 3, 198715,0002,0004,200–4,428

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 415,363 · prior 12 1,881,950(-78%)

0100K200K300K19831984

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23931619, documented in the API reference.