WELL · 42-239-31881 · DISTRICT 2

Powers "G" #1

N

Jackson County  · Vertical

Powers "G" #1 (API 42-239-31881) is a permitted well in Jackson County filed by Bridge Oil Production CO., Inc.; no completion report is on file yet.

The RRC has issued 6 drilling permits between 1983 and 1991, permitted to 4,812 ft.

Completion filings report one formation top, including Frio.

Operator of record

Bridge Oil Production Co., Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 9, 1993
Permits on file
97
Phone
(972) 788-3300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOutline Oil Corp.through Jul 1994
Latest permitBridge Oil Production Co., Inc.Sep 24, 1991
4,812
total depth, ft
6
permits on file
Sep 24, 1991
last permit issued
—
completed
0
cumulative oil, bbl
77
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Powers -G- G-2-127471Morales (3670)Atasca Resources, Inc.1077Jan 1993 – Jan 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Outline Oil Corp.Jun 1994 → Jul 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
392119-99RecompletionBridge Oil Production Co., Inc.Sep 20, 1991Sep 24, 1991—3,560
344768-99RecompletionTXO Production Corp.Apr 4, 1988Apr 5, 1988—4,812
290161-99RecompletionTXO Production Corp.Nov 1, 1985Nov 15, 1985—4,800
275883-99RecompletionTXO Production Corp.May 17, 1985May 23, 1985—4,800
270558-99RecompletionTXO Production Corp.Mar 22, 1985Mar 25, 1985—4,800
199729-99DrillTXO Production Corp.Aug 31, 1983Jun 28, 1983—4,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-127471————

Formation tops

As filed on W-2/G-1. Subsea from 105 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,500-2,395
FrioTOP OF FRIO2,500-2,395

Perforations

Perforated and open-hole intervals.

FromToType
3,6443,648Perforated
3,6773,680Perforated
3,8143,816Perforated
3,9974,000Perforated
4,1454,147Perforated
4,4054,407Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,76012.25650 S
2.8754,6227.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 1991Apr 8, 1991—
00Jun 22, 1988Apr 25, 1988Yes
00Jun 21, 1988——
00Feb 7, 1986Dec 27, 1985Yes
00Jan 14, 1986——
00Jul 9, 1985Jun 5, 1985Yes
00Jun 29, 1985——
00Apr 12, 1985Mar 27, 1985—
00Apr 4, 1985——
00Jan 12, 1984Aug 1, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23931881, documented in the API reference.