TEXAS · WELLS · JACKSON COUNTY · API 42-239-32134 · DISTRICT 02

West Ranch (41-a/98-a Cons) Unit #509J

Shut in

Jackson County · West Ranch (41-a & 98-a Cons.) field · Observation  · Directional · Sidetrack

Fields on the latest permit · any of 2
West Ranch (Mitchell) · West Ranch (41-A)
Not one formation; the well must be completed in one of them, and no target formation is stated.

West Ranch (41-A/98-A Cons) Unit #509J (API 42-239-32134) is a well in Jackson County operated by Hilcorp Energy Company, completed June 4, 2016 and listed as observation on the RRC schedule, shut in February 1, 2026.

The RRC has issued 4 drilling permits between 1984 and 1990, permitted to 6,360 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 9 formation tops, including Catahoula, Marginulina 5000, Frio, Greta.

Its 4 leases have reported 17.4M barrels of oil and 8.39M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The leases carry 688 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,459
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitMobil Producing TX. & N.M. Inc.Sep 28, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,360
total depth, ft
4
permits on file
Sep 28, 1990
last permit issued
Jun 4, 2016
completed
17.4M
cumulative oil, bbl
8.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 4, 2016
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 688 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy Company2876.03M5.63Mby Jan 1993 – Aug 2026
West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company2539.27M8.19KJul 2016 – Jul 2026
West Ranch -A- O-2-10962West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company8251K36.9KFeb 2015 – Jun 2016
West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy Company662M2.71Mby Jan 1993 – Jan 2015

Oil, barrels lease total

Last 12 months 764,359 · prior 12 965,157(-21%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 36,012 · prior 12 56,503(-36%)

010K20K202420252026

Wells named West Ranch (41-a/98-a Cons) Unit

Hilcorp Energy Company's other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
Hilcorp Energy CompanyJul 1, 2016today

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
  2. 2Meridian Oil Inc.Mar 1996 → Jul 1996
  3. 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
  4. 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
  5. 5Vintage Petroleum, LLCMay 2006 → Jul 2007
  6. 6Hilcorp Energy CompanyAug 2007 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
378635-99Recompletion · sidetrackMobil Producing TX. & N.M. Inc.Sep 28, 1990Sep 28, 1990Oct 23, 19906,360
371998-99RecompletionMobil Producing TX. & N.M. Inc.Apr 9, 1990Apr 11, 1990—6,360
333346-99RecompletionMobil Producing TX. & N.M. Inc.Jul 23, 1987Jul 29, 1987—6,300
257438-99DrillMobil Producing TX. & N.M. Inc.Oct 31, 1984Nov 13, 1984—5,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 4, 2016West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyObservation · shut in Feb 1, 20266,360
Feb 22, 1991West Ranch -A- O-2-10962West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyNot on Schedule—
Feb 22, 1991West Ranch -A- O-2-10962West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyNot on Schedule—
Feb 22, 1991West Ranch -A- O-2-1696West Ranch (41-A)Hilcorp Energy CompanyNot on Schedule—
Jun 13, 1990West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyNot on Schedule—
Mar 22, 1988West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyNot on Schedule—
Mar 22, 1988West Ranch -A- O-2-1703West Ranch (98-A)Hilcorp Energy CompanyNot on Schedule—
Oct 24, 1985West Ranch -A- O-2-1656West Ranch (Greta)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →

FormationMD ftSubsea
Catahoula4,320-4,300
Marginulina 50004,980-4,960
Frio5,025-5,005
Greta5,083-5,063
Gretta5,115-5,095
Glasscock5,470-5,450
Glasscock5,499-5,479
Ward5,675-5,655
41-A5,685-5,665
41-A5,748-5,728
98-A6,129-6,109

Perforations

Perforated and open-hole intervals.

FromToType
5,0965,100Perforated
5,1165,126Perforated
5,7605,770Perforated
6,1496,158Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,51314.75900 S
10.751,513——
75,0829.875300 S
75,082——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 15, 2017Jul 8, 2017—
00Jan 12, 2017Mar 8, 1991Yes
00May 26, 2015Mar 8, 1991Yes
00Apr 25, 1991Mar 8, 1991Yes
00Mar 15, 1991Jul 12, 1990Yes
00Oct 3, 1990Jul 12, 1990Yes
00Aug 10, 1990——
00Jun 8, 1990Apr 9, 1990—
00Apr 20, 1990Apr 11, 1988Yes
00May 18, 1988Apr 11, 1988Yes
00May 6, 1988——
00Dec 19, 1985Nov 18, 1985Yes
00Dec 10, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23932134, documented in the API reference.