TEXAS · WELLS · JACKSON COUNTY · API 42-239-32134 · DISTRICT 02
West Ranch (41-a/98-a Cons) Unit #509J
Jackson County · West Ranch (41-a & 98-a Cons.) field · Observation · Directional · Sidetrack
- Fields on the latest permit · any of 2
- West Ranch (Mitchell) · West Ranch (41-A)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
West Ranch (41-A/98-A Cons) Unit #509J (API 42-239-32134) is a well in Jackson County operated by Hilcorp Energy Company, completed June 4, 2016 and listed as observation on the RRC schedule, shut in February 1, 2026.
The RRC has issued 4 drilling permits between 1984 and 1990, permitted to 6,360 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 9 formation tops, including Catahoula, Marginulina 5000, Frio, Greta.
Its 4 leases have reported 17.4M barrels of oil and 8.39M mcf of gas since the record begins in January 1993, last reporting volume in August 2026. The leases carry 688 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,459
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Aug 2026 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Sep 28, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,360
- total depth, ft
- 4
- permits on file
- Sep 28, 1990
- last permit issued
- Jun 4, 2016
- completed
- 17.4M
- cumulative oil, bbl
- 8.39M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 4, 2016
- Shut in
- Feb 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 688 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | 287 | 6.03M | 5.63M | by Jan 1993 – Aug 2026 |
| West Ranch (41-a/98-a Cons) Unit O-2-11296 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | 253 | 9.27M | 8.19K | Jul 2016 – Jul 2026 |
| West Ranch -A- O-2-10962 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | 82 | 51K | 36.9K | Feb 2015 – Jun 2016 |
| West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | 66 | 2M | 2.71M | by Jan 1993 – Jan 2015 |
Oil, barrels lease total
Last 12 months 764,359 · prior 12 965,157(-21%)
Gas, mcf lease total
Last 12 months 36,012 · prior 12 56,503(-36%)
Wells named West Ranch (41-a/98-a Cons) Unit
Hilcorp Energy Company's other wells filed under this lease name in Jackson County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Operator on the lease's P-4
Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.
| Operator | From | To |
|---|---|---|
| Hilcorp Energy Company | Jul 1, 2016 | today |
Reporting production
Every operator that reported production on this well's lease, in order.
- 1Meridian Oil Production Inc.Jan 1993 → Feb 1996
- 2Meridian Oil Inc.Mar 1996 → Jul 1996
- 3Burlington Resources Oil&gas Co.Aug 1996 → Mar 1997
- 4Vintage Petroleum, Inc.Apr 1997 → Apr 2006
- 5Vintage Petroleum, LLCMay 2006 → Jul 2007
- 6Hilcorp Energy CompanyAug 2007 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 378635-99 | Recompletion · sidetrack | Mobil Producing TX. & N.M. Inc. | Sep 28, 1990 | Sep 28, 1990 | Oct 23, 1990 | 6,360 |
| 371998-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Apr 9, 1990 | Apr 11, 1990 | — | 6,360 |
| 333346-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 23, 1987 | Jul 29, 1987 | — | 6,300 |
| 257438-99 | Drill | Mobil Producing TX. & N.M. Inc. | Oct 31, 1984 | Nov 13, 1984 | — | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 4, 2016 | West Ranch (41-a/98-a Cons) Unit O-2-11296 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | Observation · shut in Feb 1, 2026 | 6,360 |
| Feb 22, 1991 | West Ranch -A- O-2-10962 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | Not on Schedule | — |
| Feb 22, 1991 | West Ranch -A- O-2-10962 | West Ranch (41-a & 98-a Cons.) | Hilcorp Energy Company | Not on Schedule | — |
| Feb 22, 1991 | West Ranch -A- O-2-1696 | West Ranch (41-A) | Hilcorp Energy Company | Not on Schedule | — |
| Jun 13, 1990 | West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | Not on Schedule | — |
| Mar 22, 1988 | West Ranch -A- O-2-1703 | West Ranch (98-A) | Hilcorp Energy Company | Not on Schedule | — |
| Mar 22, 1988 | West Ranch -A- O-2-1703 | West Ranch (98-A) | Hilcorp Energy Company | Not on Schedule | — |
| Oct 24, 1985 | West Ranch -A- O-2-1656 | West Ranch (Greta) | Hilcorp Energy Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 20 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,096 | 5,100 | Perforated |
| 5,116 | 5,126 | Perforated |
| 5,760 | 5,770 | Perforated |
| 6,149 | 6,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,513 | 14.75 | 900 S |
| 10.75 | 1,513 | — | — |
| 7 | 5,082 | 9.875 | 300 S |
| 7 | 5,082 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 15, 2017 | Jul 8, 2017 | — |
| 00 | Jan 12, 2017 | Mar 8, 1991 | Yes |
| 00 | May 26, 2015 | Mar 8, 1991 | Yes |
| 00 | Apr 25, 1991 | Mar 8, 1991 | Yes |
| 00 | Mar 15, 1991 | Jul 12, 1990 | Yes |
| 00 | Oct 3, 1990 | Jul 12, 1990 | Yes |
| 00 | Aug 10, 1990 | — | — |
| 00 | Jun 8, 1990 | Apr 9, 1990 | — |
| 00 | Apr 20, 1990 | Apr 11, 1988 | Yes |
| 00 | May 18, 1988 | Apr 11, 1988 | Yes |
| 00 | May 6, 1988 | — | — |
| 00 | Dec 19, 1985 | Nov 18, 1985 | Yes |
| 00 | Dec 10, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32134 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32134 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932134, documented in the API reference.