WELL · 42-239-32659 · DISTRICT 2
Garner Gas Unit #1
Jackson County · Speaks SW. (2850) field · Vertical
Garner Gas Unit #1 (API 42-239-32659) is a plugged well in Jackson County, plugged August 14, 2004, last operated by Petro-Hunt L.L.C..
The RRC has issued one drilling permit, issued September 4, 1992, permitted to 4,000 ft.
It was permitted by Indexgeo & Associates, Inc. and has since transferred to Petro-Hunt L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Catahoula.
Operator of record
Permitted by Indexgeo & Associates, Inc.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 25, 2025
- Permits on file
- 104
- Phone
- (214) 880-8400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petro-Hunt L.L.C. |
| Production reports | Petro-Hunt, L.L.C.through Oct 2003 |
| Latest permit | Indexgeo & Associates, Inc.Sep 4, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Sep 4, 1992
- last permit issued
- Dec 9, 1992
- completed
- 0
- cumulative oil, bbl
- 1.42M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 9, 1992
- Shut in
- —
- Plugged
- Aug 14, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garner Gas Unit G-2-144280 | Speaks, SW. (2850) | Petro-Hunt, L.L.C. | 1 | 0 | 1.42M | Jan 1993 – Aug 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Indexgeo & Associates, Inc.Jan 1993 → Nov 1993
- 2Petro-Hunt CorporationDec 1993 → Oct 1998
- 3Petro-Hunt, L.L.C.Nov 1998 → Oct 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 403055-99 | Drill | Indexgeo & Associates, Inc. | Sep 2, 1992 | Sep 4, 1992 | Oct 6, 1992 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-144280 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 140 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Catahoula | 2,565 | -2,425 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,708 | 2,710 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 413 | 12.25 | 150 S |
| 2.875 | 3,974 | 7.875 | 515 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 12, 1993 | Jan 19, 1993 | Yes |
| 00 | Mar 12, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32659 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32659 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932659, documented in the API reference.