WELL · 42-239-32933 · DISTRICT 2
Borchers Ranch - Bor #1
Jackson County · McDaniel (3750) field · Vertical
Borchers Ranch - Bor #1 (API 42-239-32933) is a plugged well in Jackson County, plugged November 8, 2005, last operated by Allegro Investments Inc..
The RRC has issued 2 drilling permits between 1997 and 1998, permitted to 4,800 ft.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Catahoula, Frio.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Dec 12, 2019
- Permits on file
- 298
- Phone
- (361) 573-5619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Allegro Investments Inc. |
| Production reports | Allegro Investments, Inc.through Feb 2003 |
| Latest permit | Allegro Investments, Inc.Jul 24, 1998 |
- 4,800
- total depth, ft
- 2
- permits on file
- Jul 24, 1998
- last permit issued
- Nov 10, 1997
- completed
- 0
- cumulative oil, bbl
- 196K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Nov 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 10, 1997
- Shut in
- —
- Plugged
- Nov 8, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Borchers Ranch - Bor G-2-170212 | McDaniel (2800) | Allegro Investments, Inc. | 1 | 0 | 155K | Jul 1998 – Nov 2005 |
| Borchers Ranch - Bor G-2-166980 | McDaniel (3750) | Allegro Investments, Inc. | 1 | 0 | 41.3K | Nov 1997 – Jul 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Allegro Investments, Inc.Nov 1997 → Feb 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 478214-99 | Recompletion | Allegro Investments, Inc. | Jul 24, 1998 | Jul 24, 1998 | Jul 24, 1998 | 4,310 |
| 456986-99 | Drill | Allegro Investments, Inc. | Jan 6, 1997 | Jan 6, 1997 | Aug 24, 1997 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-166980 | — | — | — | — |
| — | — G-2-170212 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE (BASE) | 1,330 | -1,203 |
| CatahoulaCATAHOULA (TOP) | 2,520 | -2,393 |
| FrioFRIO MASSIVE (TOP) | 4,080 | -3,953 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,834 | 2,838 | Perforated |
| 3,742 | 3,744 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 500 | 12.25 | 222 S |
| 2.875 | 4,310 | 7.875 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 25, 1999 | Aug 13, 1998 | Yes |
| 00 | Oct 9, 1998 | — | — |
| 00 | Apr 30, 1998 | Jan 16, 1998 | Yes |
| 00 | Mar 12, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-239-32933 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-239-32933 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23932933, documented in the API reference.