TEXAS · WELLS · JACKSON COUNTY · API 42-239-33066 · DISTRICT 02

Heirs Born #1

Plugged

Jackson County · Wildcat (Dry Hole) field  · Vertical

Fields on the latest permit · any of 12
El Toro (Lay) · El Toro (5250) · Field 28203444 · El Toro (5400) · El Toro, South (5500) · El Toro, South (5500 -A-) · El Toro, South (5600) · El Toro, South (5600 F.B.E.) · El Toro, South (5650 Sd.) · El Toro South (5900 Sd.) · El Toro, South (6200) · El Toro, SW. (6300)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Heirs Born #1 (API 42-239-33066) is a plugged well in Jackson County, plugged May 8, 2000, last operated by Allegro Investments Inc..

The RRC has issued one drilling permit, issued April 19, 2000, permitted to 6,500 ft.

It was permitted by Allegro Investments, Inc. and has since transferred to Allegro Investments Inc. on the wellbore schedule.

Operator of record

Allegro Investments Inc.

Permitted by Allegro Investments, Inc.; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAllegro Investments, Inc.Apr 19, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Apr 19, 2000
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
May 8, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
494236-99DrillAllegro Investments, Inc.Apr 19, 2000Apr 19, 2000Apr 29, 20006,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933066, documented in the API reference.