TEXAS · WELLS · JACKSON COUNTY · API 42-239-33681 · DISTRICT 02

West Ranch (41-a/98-a Cons) Unit #2150

Y

Jackson County · West Ranch (41-a & 98-a Cons.) field · Producing  · Vertical

West Ranch (41-A/98-A Cons) Unit #2150 (API 42-239-33681) is a well in Jackson County operated by Hilcorp Energy Company, completed August 4, 2020 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 9, 2015, permitted to 6,503 ft.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta - Disposal.

Its 2 leases have reported 9.16M barrels of oil and 44.6K mcf of gas since February 2015, last reporting in July 2026. The leases carry 335 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyJun 9, 2015
6,503
total depth, ft
1
permits on file
Jun 9, 2015
last permit issued
Aug 4, 2020
completed
9.16M
cumulative oil, bbl
44.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 4, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 335 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company2539.11M7.69KJul 2016 – Jul 2026
West Ranch -A- O-2-10962West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company8251K36.9KFeb 2015 – Mar 2017

Oil, barrels lease total

Last 12 months 784,079 · prior 12 878,766(-11%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyFeb 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
807280-99DrillHilcorp Energy CompanyJun 8, 2015Jun 9, 2015May 16, 20167,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 4, 2020West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyProducing6,503
May 25, 2016West Ranch -A- O-2-10962West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,261-4,236
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,320-4,295
FrioFRIO - DISPOSAL5,000-4,975
FrioFRIO - DISPOSAL5,025-5,000
Gretta - Disposal5,102-5,077
Gretta - Disposal5,115-5,090

Perforations

Perforated and open-hole intervals.

FromToType
5,7345,744Perforated
6,0776,081Perforated
6,1046,178Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,34213.51,215 S
76,5039.8751,620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2020Sep 9, 2020—
00May 14, 2020Jul 3, 2019—
00Mar 14, 2018Sep 22, 2017—
00Jan 17, 2017Jan 9, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

269K
bbl, last 12 reported months
269K
bbl, all reported
May 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000118088H-1 InjectionCanceled Feb 24, 202215,0002,8405,694–6,246

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 268,845

050K100K150K2021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933681, documented in the API reference.