TEXAS · WELLS · JACKSON COUNTY · WEST RANCH (41-A/98-A CONS) UNIT LEASE · API 42-239-33769 · DISTRICT 02

West Ranch (41-a/98-a Cons) Unit #1077

Shut in

Jackson County · West Ranch (41-a & 98-a Cons.) field · Shut In  · Directional

West Ranch (41-A/98-A Cons) Unit #1077 (API 42-239-33769) is a well in Jackson County operated by Hilcorp Energy Company, completed November 16, 2024 and listed as shut in on the RRC schedule, shut in June 1, 2024.

The RRC has issued one drilling permit, issued April 26, 2016, permitted to 6,489 ft.

Completion filings report 3 formation tops, including Catahoula, Frio, Gretta - Disposal.

Its lease has reported 9.11M barrels of oil and 7.69K mcf of gas since July 2016, last reporting in July 2026. The lease carries 253 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyApr 26, 2016
6,489
total depth, ft
1
permits on file
Apr 26, 2016
last permit issued
Nov 16, 2024
completed
9.11M
cumulative oil, bbl
7.69K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 16, 2024
Shut in
Jun 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 253 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy Company2539.11M7.69KJul 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 784,079 · prior 12 878,766(-11%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyJul 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
815197-99DrillHilcorp Energy CompanyApr 21, 2016Apr 26, 2016Oct 26, 20167,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 16, 2024West Ranch (41-a/98-a Cons) Unit O-2-11296West Ranch (41-a & 98-a Cons.)Hilcorp Energy CompanyShut In · shut in Jun 1, 20246,489

Formation tops

As filed on W-2/G-1. Subsea from 27 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE4,261-4,234
FrioFRIO - DISPOSAL5,000-4,973
FrioFRIO - DISPOSAL5,025-4,998
Gretta - Disposal5,102-5,075
CatahoulaCATAHOULA - DISPOSAL, H2S (CORDE5,115-5,088
Gretta - Disposal5,115-5,088

Perforations

Perforated and open-hole intervals.

FromToType
5,7815,787Perforated
5,7915,812Perforated
6,1166,132Perforated
6,1436,164Perforated
6,1436,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,34013.51,096 S
76,5059.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 16, 2024Nov 21, 2024—
00Jun 1, 2023Apr 4, 2023—
00Oct 30, 2020Oct 5, 2020—
00May 31, 2017May 30, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114383H-1 InjectionActive20,0002,8755,700–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933769, documented in the API reference.