TEXAS · WELLS · JACKSON COUNTY · API 42-239-33873 · DISTRICT 02

West Ranch (41-a/98-a Cons) Unit #1175

N

Jackson County  · Directional

West Ranch (41-A/98-A Cons) Unit #1175 (API 42-239-33873) is a former disposal or injection well in Jackson County, last operated by Hilcorp Energy Company; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued May 10, 2017, permitted to 7,200 ft.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitHilcorp Energy CompanyMay 10, 2017
7,200
total depth, ft
1
permits on file
May 10, 2017
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
825973-99DrillHilcorp Energy CompanyApr 27, 2017May 10, 2017—7,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115850H-1 InjectionCanceled Mar 30, 202120,0002,8505,700–6,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/23933873, documented in the API reference.