WELL · 42-241-30350 · DISTRICT 3

Arco-Fee B #6UT

N

Jasper County · Sally Withers West (Wilcox) field  · Vertical

Arco-Fee B #6UT (API 42-241-30350) is a well in Jasper County operated by Petro-Lewis Corporation, completed February 10, 1982.

The RRC has issued one drilling permit, issued May 20, 1981, permitted to 10,600 ft.

Its 2 leases have reported 63.8K barrels of oil and 144K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Petro-Lewis Corporation

Based in
New Orleans, LA
P-5 status
Inactive (I)
P-5 last filed
Jul 28, 1986
Permits on file
347
Phone
(303) 294-1137

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetro-Lewis Corporation
Production reportsPaleo Oil Company LLCthrough Apr 2026
Latest permitPetro-Lewis CorporationMay 20, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
1
permits on file
May 20, 1981
last permit issued
Feb 10, 1982
completed
63.8K
cumulative oil, bbl
144K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Fee -B- O-3-11395Sally Withers, West (Wilcox)Paleo Oil Company LLC422.9K43.7KJan 1993 – Jul 2026
Arco Fee "B" O-3-12789Sally Withers, W. (9850)Paleo Oil Company LLC441K100KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 3,261 · prior 12 7,862(-59%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 1,081 · prior 12 722(+50%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Eland Energy, Inc.Jan 1993 → Nov 1994
  2. 2Lindenmuth & Associates, Inc.Dec 1994 → Aug 1998
  3. 3Key Petroleum Inc.Sep 1998 → Sep 1998
  4. 4Stanford Petroleum IncOct 1998 → May 2001
  5. 5Gcea, LLCJun 2001 → Oct 2003
  6. 6Peoples Energy Prod.-TX, L.P.Nov 2003 → May 2004
  7. 7BRG Petroleum CorporationJun 2004 → Feb 2005
  8. 8Chesapeake Operating, Inc.Mar 2005 → Oct 2014
  9. 9Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
  10. 10SND Operating, L.L.C.Jan 2015 → Sep 2017
  11. 11Weatherly Oil & Gas, LLCOct 2017 → Apr 2019
  12. 12Shoco Production, L.P.May 2019 → May 2020
  13. 13Shoco Production LLCJun 2020 → Sep 2025
  14. 14Paleo Oil Company LLCOct 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
119699-99DrillPetro-Lewis CorporationMay 20, 1981May 20, 1981Jun 5, 198110,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-11395————
—— O-3-12789————

Perforations

Perforated and open-hole intervals.

FromToType
9,8729,894Perforated
10,40010,446Perforated
—10,446Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,72414.751,480 S
2.3759,794——
2.37510,298——
710,5459.875320 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 1, 1982—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130350, documented in the API reference.