WELL · 42-241-30439 · DISTRICT 3

Arco Fee #E1

Y

Jasper County · Red Bank Creek field · Producing  · Vertical

Arco Fee #E1 (API 42-241-30439) is a well in Jasper County operated by Neches Transport Inc., completed August 18, 1985 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 24, 1985, permitted to 10,400 ft.

It was permitted by Ballard Exploration Company,Inc. and has since transferred to Neches Transport Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

Its lease has reported 31.7K barrels of oil and 137 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Neches Transport Inc.

Permitted by Ballard Exploration Company,inc.; the EWA schedule now lists a different operator.

Based in
Spurger, TX
P-5 status
Active (A)
P-5 last filed
Jan 21, 2026
Permits on file
1
Phone
(409) 429-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeches Transport Inc.
Production reportsNeches Transport Inc.through Apr 2026
Latest permitBallard Exploration Company,inc.Jun 24, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,400
total depth, ft
1
permits on file
Jun 24, 1985
last permit issued
Aug 18, 1985
completed
31.7K
cumulative oil, bbl
137
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 18, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Fee O-3-18835Red Bank CreekNeches Transport Inc.131.7K137Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 26 · prior 12 29(-10%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ballard Exploration Company,inc.Jan 1993 → Oct 2003
  2. 2Morris, W. Dale Inc.Nov 2003 → Jul 2004
  3. 3Chaparral Energy, L.L.C.Aug 2004 → Jul 2012
  4. 4Five-Jab, Inc.Aug 2012 → Nov 2014
  5. 5Jeffcoat Production Company Inc.Dec 2014 → Feb 2021
  6. 6J3 Operating LLCMar 2021 → Aug 2024
  7. 7Neches Transport Inc.Sep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
278549-99DrillBallard Exploration Company,inc.Jun 24, 1985Jun 24, 1985—10,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-18835————

Formation tops

As filed on W-2/G-1. Subsea from 92 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaSECOND YEGUA6,790-6,698
WilcoxFIRST WILCOX9,790-9,698
WilcoxSECOND WILCOX9,863-9,771
WilcoxTHIRD WILCOX9,917-9,825

Perforations

Perforated and open-hole intervals.

FromToType
9,9179,927Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,51713.51,264 S
5.510,4158.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 1985Aug 29, 1985Yes
00Oct 23, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130439, documented in the API reference.