WELL · 42-241-30578 · DISTRICT 3

Arco Fee A-259 #1RE

Plugged

Jasper County · Wildcat field  · Horizontal

Arco Fee A-259 #1RE (API 42-241-30578) is a plugged horizontal well in Jasper County, plugged February 1, 2012, last operated by Southern Bay Operating L.L.C..

The RRC has issued 2 drilling permits between 1994 and 2006, permitted to 16,000 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Southern Bay Operating L.L.C. on the wellbore schedule.

Completion filings report 9 formation tops, including Wilcox, Midway, Saratoga, Pecan Gap.

Operator of record

Southern Bay Operating L.L.C.

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 16, 2013
Permits on file
96
Phone
(281) 537-9920

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnervest Operating L.L.C.
Production reportsAnadarko E&P Company LPthrough Oct 2006
Latest permitAnadarko E&P Company LPOct 19, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
2
permits on file
Oct 19, 2006
last permit issued
Mar 17, 2007
completed
0
cumulative oil, bbl
2.34M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Jan 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 17, 2007
Shut in
—
Plugged
Feb 1, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Fee A-259 G-3-250044WildcatEnervest Operating, L.L.C.100Jul 2007 – Jan 2012
Arco-Fee A-259 G-6-153653Brookeland (Austin Chalk, 8800)Enervest Operating, L.L.C.102.34MOct 1994 – Jan 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1995 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Oct 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627774-99RecompletionAnadarko E&P Company LPOct 18, 2006Oct 19, 2006Nov 1, 200612,200
426754-99DrillUnion Pacific Resources CompanyAug 8, 1994Aug 8, 1994Aug 29, 199416,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 17, 2007Arco Fee A-259 G-3-250044WildcatSouthern Bay Operating L.L.C.Plugged—
Oct 21, 1994Arco-Fee A-259 G-6-153653Brookeland (Austin Chalk 8800)Enervest Operating L.L.C.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 461 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,036-3,575
Midway8,346-7,885
Saratoga9,722-9,261
Pecan Gap9,753-9,292
Ozan10,236-9,775
Taylor10,390-9,929
Taylor10,443-9,982
Austin Chalk10,714-10,253
Austin Chalk10,810-10,349
Georgetown11,888-11,427
Eagle FordEAGLEFORD15,460-14,999

Perforations

Perforated and open-hole intervals.

FromToType
10,91015,479Perforated
10,91016,753Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,50014.751,515 S
7.62510,9109.625595 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 9, 2009Jun 29, 2007—
00Aug 10, 2009——
00May 18, 1995Mar 8, 1995Yes
00Apr 17, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130578, documented in the API reference.