WELL · 42-241-30680 · DISTRICT 6

Black Stone Minerals Unit A-977 #1

Y

Jasper County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Black Stone Minerals Unit A-977 #1 (API 42-241-30680) is a horizontal well in Jasper County operated by Rockstar Production LLC, completed September 23, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 19, 2001, permitted to 13,000 ft.

It was permitted by Rme Petroleum Company and has since transferred to Rockstar Production LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Midway, Taylor, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Rockstar Production LLC

Permitted by Rme Petroleum Company; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Mar 19, 2026
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRockstar Production LLC
Production reportsArcadia Energy Resources, LLCthrough Apr 2026
Latest permitRme Petroleum CompanyMar 19, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Mar 19, 2001
last permit issued
Sep 23, 2001
completed
0
cumulative oil, bbl
1.67M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 23, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Minerals Unit A-977 G-6-186080Brookeland (Austin Chalk, 8800)Rockstar Production, LLC101.67MSep 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 17,139 · prior 12 34,408(-50%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rme Petroleum CompanyOct 2001 → Nov 2002
  2. 2Anadarko E&P Company LPDec 2002 → Jul 2007
  3. 3Enervest Operating, L.L.C.Aug 2007 → Feb 2012
  4. 4Southern Bay Operating, L.L.C.Mar 2012 → Jun 2013
  5. 5HK Energy Operating, LLCJul 2013 → Sep 2017
  6. 6Grit Oil & Gas, LLCOct 2017 → Apr 2019
  7. 7RKI Energy Resources, LLCMay 2019 → Jun 2021
  8. 8Prize Exploration & Prod, LLCJul 2021 → Dec 2023
  9. 9Arcadia Energy Resources, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
506487-99DrillRme Petroleum CompanyMar 14, 2001Mar 19, 2001Aug 11, 200113,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-186080————

Formation tops

As filed on W-2/G-1. Subsea from 336 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,300-4,964
MidwayMIDWAY SHALE9,420-9,084
TaylorTAYLOR SHALE11,405-11,069
Austin Chalk11,793-11,457

Perforations

Perforated and open-hole intervals.

FromToType
11,93416,915Open hole
11,99116,540Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,06014.75850 S
7.62511,8369.875620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 16, 2002Nov 20, 2001Yes
00Dec 31, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24130680, documented in the API reference.