WELL · 42-241-30754 · DISTRICT 3
BP-Stockstill #1
Jasper County · Wildcat field · Vertical
BP-Stockstill #1 (API 42-241-30754) is a well in Jasper County operated by Jamex Inc., completed January 19, 2008.
The RRC has issued one drilling permit (amended once), issued December 13, 2007, permitted to 12,650 ft.
Completion filings report 3 formation tops, including Yegua, Cook Mountain, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Lewisville, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 22, 2026
- Permits on file
- 332
- Phone
- (214) 265-7141
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jamex Inc. |
| Production reports | Proline Energy Resources Incthrough Aug 2024 |
| Latest permit | Jamex, Inc.Dec 13, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,650
- total depth, ft
- 2
- permits on file
- Dec 13, 2007
- last permit issued
- Jan 19, 2008
- completed
- 0
- cumulative oil, bbl
- 179K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 19, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| BP-Stockstill G-3-254768 | Bessmay (Wilcox Cons) | Proline Energy Resources Inc | 1 | 0 | 179K | Aug 2009 – Jul 2026 |
| BP-Stockstill G-3-253802 | Wildcat | Jamex, Inc. | 1 | 0 | 0 | Jan 2008 – Aug 2009 |
Gas, mcf lease total
Last 12 months 0 · prior 12 586(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jamex, Inc.Aug 2009 → May 2016
- 2Proline Energy Resources IncJun 2016 → Aug 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 650836-98 | Drill | Jamex, Inc. | Oct 12, 2009 | Dec 13, 2007 | Dec 22, 2007 | 12,650 |
| 650836-99 | Drill | Jamex, Inc. | Dec 5, 2007 | Dec 13, 2007 | Dec 22, 2007 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-253802 | — | — | — | — |
| — | — G-3-254768 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 73 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 5,865 | -5,792 |
| Cook Mountain | 8,207 | -8,134 |
| WilcoxWILCOX TOP | 10,315 | -10,242 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,477 | 10,513 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,950 | 14.75 | 2,063 S |
| 7.625 | 10,430 | 7.625 | 1,190 S |
| 5 | 12,650 | 6.75 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 2010 | Mar 30, 2009 | Yes |
| 00 | May 27, 2010 | Feb 4, 2010 | Yes |
| 00 | Mar 1, 2010 | — | — |
| 00 | Jan 6, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-241-30754 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-241-30754 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24130754, documented in the API reference.