TEXAS · WELLS · JEFFERSON COUNTY · API 42-245-30059 · DISTRICT 03

Jefferson Land Co. a/C #1 #55

Plugged

Jefferson County · Lovells Lake (Marg. 2) field  · Vertical

Jefferson Land CO. A/C #1 #55 (API 42-245-30059) is a plugged well in Jefferson County, plugged January 12, 1972, last operated by Milestone Operating Inc..

The RRC has issued one drilling permit, issued April 9, 2003, permitted to 7,700 ft.

Operator of record

Milestone Operating Inc.

Based in
Montgomery, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
90
Phone
(936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMilestone Operating Inc.
Production reportsnone
Latest permitMilestone Operating, IncApr 9, 2003
7,700
total depth, ft
1
permits on file
Apr 9, 2003
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 12, 1972

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529141-99ReenterMilestone Operating, IncMar 4, 2003Apr 9, 2003—7,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—Jefferson Land Co. a/C #1 O-3-9043Lovells Lake (Marg. 2)Milestone Operating Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
—7,282Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.