TEXAS · WELLS · JEFFERSON COUNTY · API 42-245-30389 · DISTRICT 03

Garth Co. #1

Plugged

Jefferson County · Nome North (Yegua) field  · Vertical

Garth CO. #1 (API 42-245-30389) is a plugged well in Jefferson County, plugged March 21, 1978, last operated by Texas City Refg. Inc..

The RRC has issued one drilling permit, issued October 11, 1977, permitted to 10,720 ft.

Operator of record

Texas City Refg. Inc.

Based in
Texas City, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 23, 1988
Permits on file
127
Phone
(409) 948-0809

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTexas City Refg. Inc.Oct 11, 1977
10,720
total depth, ft
1
permits on file
Oct 11, 1977
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 21, 1978

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
9463-99RecompletionTexas City Refg. Inc.Oct 11, 1977Oct 11, 1977—10,720

Completions

CompletedLeaseFieldOperatorStatusDepth
—Garth Co. G-3-71914Nome North (Yegua)Texas City Refg. Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
9,7489,754Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24530389, documented in the API reference.