TEXAS · WELLS · JEFFERSON COUNTY · HOLLOWAY UNIT LEASE · API 42-245-32223 · DISTRICT 03

Holloway Unit #2

Plugged

Jefferson County · Alphabet Soup Z (Hackberry) field  · Directional

Holloway Unit #2 (API 42-245-32223) is a plugged well in Jefferson County, plugged February 14, 2015, last operated by Magnum Producing LP.

The RRC has issued one drilling permit (amended once), issued November 2, 1999, permitted to 9,200 ft.

It was permitted by Aspect Resources LLC and has since transferred to Magnum Producing LP on the wellbore schedule.

Completion filings report 4 formation tops, including Bmio, Hit, Marg, Cib Hazz.

Its lease has reported 846 barrels of oil and 921K mcf of gas since March 2000, with no volume in the three years through April 2026.

Operator of record

Magnum Producing LP

Permitted by Aspect Resources LLC; the EWA schedule now lists a different operator.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Feb 26, 2026
Permits on file
312
Phone
(361) 882-3858

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMagnum Producing LP
Production reportsMagnum Producing, LPthrough Nov 2010
Latest permitAspect Resources LLCNov 2, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
2
permits on file
Nov 2, 1999
last permit issued
Mar 16, 2000
completed
846
cumulative oil, bbl
921K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2000 THROUGH Nov 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 16, 2000
Shut in
—
Plugged
Feb 14, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holloway Unit G-3-179980Alphabet Soup "Z" (Hackberry)Magnum Producing, LP1846921KMar 2000 – Nov 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Helmerich & Payne, Inc.May 2000 → Sep 2002
  2. 2Cimarex Energy Co.Oct 2002 → Oct 2003
  3. 3Magnum Producing & Operating Co.Dec 2003 → Jan 2004
  4. 4Magnum Producing, LPFeb 2004 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489074-98DrillAspect Resources LLCFeb 16, 2000Nov 2, 1999—9,200
489074-99DrillAspect Resources LLCNov 2, 1999Nov 2, 1999Oct 8, 19999,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 16, 2000Holloway Unit G-3-179980Alphabet Soup Z (Hackberry)Magnum Producing LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 8 ft elevation.Download CSV →

FormationMD ftSubsea
Bmio6,350-6,342
Hit6,500-6,492
Marg6,968-6,960
Cib Hazz7,332-7,324

Perforations

Perforated and open-hole intervals.

FromToType
8,4288,434Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,00014.755,030 S
78,0709.875470 S
3.58,685575 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 26, 2001May 29, 2000Yes
00Dec 15, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24532223, documented in the API reference.