WELL · 42-245-32289 · DISTRICT 3
Crawford A #4
Jefferson County · Angelina (12 500) field · Vertical
Crawford A #4 (API 42-245-32289) is a plugged well in Jefferson County, plugged November 2, 2006, last operated by Eog Resources Inc..
The RRC has issued one drilling permit, issued April 23, 2001, permitted to 14,000 ft.
Completion filings report 16 formation tops, including Fault, Het, Englin, Crawford.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 2, 2025
- Permits on file
- 16,348
- Phone
- (713) 651-7000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Oct 2002 |
| Latest permit | EOG Resources, Inc.Apr 23, 2001 |
- 14,000
- total depth, ft
- 1
- permits on file
- Apr 23, 2001
- last permit issued
- Oct 3, 2001
- completed
- 0
- cumulative oil, bbl
- 19.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Nov 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 3, 2001
- Shut in
- —
- Plugged
- Nov 2, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crawford "A" G-3-187056 | Angelina (12,500) | EOG Resources, Inc. | 1 | 0 | 19.7K | Oct 2001 – Nov 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Oct 2001 → Oct 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 508097-99 | Drill | EOG Resources, Inc. | Apr 23, 2001 | Apr 23, 2001 | Jun 13, 2001 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-187056 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 14 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Fault | 7,794 | -7,780 |
| Het | 7,878 | -7,864 |
| Englin | 8,244 | -8,230 |
| Crawford | 8,606 | -8,592 |
| Sullivan | 8,928 | -8,914 |
| Fault | 9,094 | -9,080 |
| Smith | 9,573 | -9,559 |
| B. Smith | 9,924 | -9,910 |
| Marg Tex | 10,269 | -10,255 |
| Non Strum | 10,524 | -10,510 |
| Nadasaria | 10,769 | -10,755 |
| Lieb | 11,044 | -11,030 |
| Discorbis | 11,439 | -11,425 |
| Uvig | 11,764 | -11,750 |
| Tex-Miss-2 | 12,219 | -12,205 |
| Tex Miss-1 | 12,644 | -12,630 |
| Tex-Miss-3 | 13,244 | -13,230 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,162 | 13,166 | Perforated |
| 13,172 | 13,176 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,180 | 17.5 | 3,340 S |
| 9.625 | 10,120 | 12.25 | 665 S |
| 7 | 12,122 | 8.5 | 370 S |
| 4.5 | 13,328 | 6.125 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 2002 | Jan 11, 2002 | Yes |
| 00 | Feb 27, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32289 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32289 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532289, documented in the API reference.