TEXAS · WELLS · JEFFERSON COUNTY · API 42-245-32546 · DISTRICT 03

E. Thomas #52R

Shut in

Jefferson County · Fannett field · Shut In  · Directional

E. Thomas #52R (API 42-245-32546) is a well in Jefferson County operated by Hilcorp Energy Company, completed December 20, 2008 and listed as shut in on the RRC schedule, shut in November 1, 2017.

The RRC has issued 2 drilling permits between 2008 and 2012, permitted to 7,526 ft.

Completion filings report 4 formation tops, including Marg, Marg Sd, Frio, Marg Tx.

Its 2 leases have reported 19.1K barrels of oil and 507K mcf of gas since December 2008, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Oct 2017
Latest permitHilcorp Energy CompanySep 25, 2012
7,526
total depth, ft
2
permits on file
Sep 25, 2012
last permit issued
Dec 20, 2008
completed
19.1K
cumulative oil, bbl
507K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 20, 2008
Shut in
Nov 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thomas, E. et Al G-3-271050Fannett *Hilcorp Energy Company10152KDec 2011 – Jul 2026
E. Thomas O-3-25280FannettHilcorp Energy Company119.1K355KDec 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Penn Virginia Oil & Gas, L.P.Dec 2008 → Jan 2010
  2. 2Hilcorp Energy CompanyFeb 2010 → Oct 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
748301-99RecompletionHilcorp Energy CompanySep 14, 2012Sep 25, 2012Apr 25, 20107,526
656692-99DrillPenn Virginia Oil & Gas, L.P.Mar 5, 2008Mar 13, 2008Nov 21, 200812,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 30, 2011Thomas E. et Al G-3-271050Fannett *Hilcorp Energy CompanyTemp Abandoned · shut in Nov 1, 20177,526
Dec 20, 2008E. Thomas O-3-25280FannettHilcorp Energy CompanyShut In · shut in Dec 1, 20127,526

Formation tops

As filed on W-2/G-1. Subsea from 10 ft elevation.Download CSV →

FormationMD ftSubsea
Marg7,003-6,993
Marg SD7,033-7,023
FrioUPPER FRIO7,131-7,121
FrioUPPER FRIO7,161-7,151
Marg TX7,325-7,315
Marg TX7,355-7,345

Perforations

Perforated and open-hole intervals.

FromToType
7,0757,089Perforated
7,2107,220Perforated
7,2387,254Perforated
7,3907,563Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,31711428 S
4.57,5637.625840 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 13, 2014Oct 1, 2012—
00Mar 17, 2009Jan 2, 2009Yes
00Mar 3, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24532546, documented in the API reference.