TEXAS · WELLS · JEFFERSON COUNTY · NINE DRAGONS LEASE · API 42-245-32633 · DISTRICT 03
Nine Dragons #1
Jefferson County · Constitution (Yegua) field · Directional
Nine Dragons #1 (API 42-245-32633) is a plugged well in Jefferson County, plugged October 11, 2013, last operated by Cimarex Energy CO..
The RRC has issued one drilling permit, issued December 14, 2009, permitted to 15,500 ft.
Completion filings report 3 formation tops, including Vicksburg, Moods Branch, Ey-1.
Its lease has reported 413K barrels of oil and 11.4M mcf of gas since March 2010, with no volume in the three years through April 2026.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 8, 2025
- Permits on file
- 2,082
- Phone
- (432) 571-7800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cimarex Energy Co. |
| Production reports | Cimarex Energy Co.through Feb 2013 |
| Latest permit | Cimarex Energy Co.Dec 14, 2009 |
- 15,500
- total depth, ft
- 1
- permits on file
- Dec 14, 2009
- last permit issued
- Mar 25, 2010
- completed
- 413K
- cumulative oil, bbl
- 11.4M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Feb 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 25, 2010
- Shut in
- —
- Plugged
- Oct 11, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nine Dragons G-3-258103 | Constitution (Yegua) | Cimarex Energy Co. | 1 | 413K | 11.4M | Mar 2010 – Feb 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co.Mar 2010 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 688525-99 | Drill | Cimarex Energy Co. | Dec 10, 2009 | Dec 14, 2009 | Jan 4, 2010 | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 25, 2010 | Nine Dragons G-3-258103 | Constitution (Yegua) | Cimarex Energy Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 33 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Vicksburg | 8,300 | -8,267 |
| Moods Branch | 11,300 | -11,267 |
| EY-1 | 12,400 | -12,367 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,487 | 14,668 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,442 | 17.5 | 4,420 S |
| 9.625 | 9,677 | 12.25 | 1,142 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 6, 2010 | Apr 30, 2010 | Yes |
| 00 | Dec 2, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32633 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32633 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532633, documented in the API reference.