WELL · 42-245-32678 · DISTRICT 3
Manion Gas Unit #2ST
Jefferson County · Constitution (Yegua) field · Directional
Manion Gas Unit #2ST (API 42-245-32678) is a plugged well in Jefferson County, plugged October 25, 2013, last operated by Wagner Oil Company.
The RRC has issued 2 drilling permits between 2010 and 2013, permitted to 16,000 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Wagner Oil Company on the wellbore schedule.
Completion filings report 6 formation tops, including Yegua, Ey-2, Fault #4, Ey-6.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 23, 2025
- Permits on file
- 278
- Phone
- (817) 335-2222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cimarex Energy Co.through Feb 2013 |
| Latest permit | Cimarex Energy Co.Aug 23, 2013 |
- 16,000
- total depth, ft
- 2
- permits on file
- Aug 23, 2013
- last permit issued
- May 17, 2011
- completed
- 0
- cumulative oil, bbl
- 365K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Nov 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 17, 2011
- Shut in
- —
- Plugged
- Oct 25, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Manion Gas Unit G-3-263887 | Constitution (Yegua) | Wagner Oil Company | 1 | 0 | 365K | May 2011 – Nov 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co.May 2011 → Feb 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 768248-99 | Recompletion | Cimarex Energy Co. | Aug 14, 2013 | Aug 23, 2013 | — | 15,000 |
| 705263-99 | Drill | Cimarex Energy Co. | Nov 11, 2010 | Nov 19, 2010 | Dec 31, 2010 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 17, 2011 | Manion Gas Unit G-3-263887 | Constitution (Yegua) | Wagner Oil Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 31 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| YeguaYEGUA MARKER | 12,032 | -12,001 |
| EY-2 | 12,324 | -12,293 |
| Fault #4 | 13,600 | -13,569 |
| EY-6 | 13,769 | -13,738 |
| Super Dave | 14,500 | -14,469 |
| Kirby | 14,730 | -14,699 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,703 | 14,707 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,351 | 17.5 | 3,910 S |
| 9.625 | 9,567 | 12.25 | 1,285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 25, 2012 | Aug 19, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32678 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32678 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532678, documented in the API reference.