TEXAS · WELLS · JEFFERSON COUNTY · GRAHAM TRUST LEASE · API 42-245-32728 · DISTRICT 03

Graham Trust #1

Shut in

Jefferson County · Rebel (Yegua) field · Producing  · Directional

Graham Trust #1 (API 42-245-32728) is a well in Jefferson County operated by Hilcorp Energy Company, completed November 2, 2012 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit (amended once), issued March 5, 2012, permitted to 12,285 ft.

It was permitted by Samson Exploration, LLC and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Anahuac, Frio, Vicksburg, Jackson.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Samson Exploration, LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jan 2026
Latest permitSamson Exploration, LLCMar 5, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,285
total depth, ft
2
permits on file
Mar 5, 2012
last permit issued
Nov 2, 2012
completed
0
cumulative oil, bbl
851K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 2, 2012
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Graham Trust G-3-266641Rebel (Yegua)Hilcorp Energy Company10851KJun 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 25,145 · prior 12 34,250(-27%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Samson Exploration, LLCJun 2012 → Aug 2016
  2. 2Hilcorp Energy CompanySep 2016 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
734391-98DrillSamson Exploration, LLCJul 26, 2012Mar 5, 2012Mar 30, 201213,500
734391-99DrillSamson Exploration, LLCFeb 22, 2012Mar 5, 2012Mar 30, 201213,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 2, 2012Graham Trust G-3-266641Rebel (Yegua)Hilcorp Energy CompanyProducing · shut in Aug 1, 202612,285

Formation tops

As filed on W-2/G-1. Subsea from 39 ft elevation.Download CSV →

FormationMD ftSubsea
Anahuac5,254-5,215
Frio5,595-5,556
Vicksburg7,903-7,864
Jackson9,165-9,126
Claiborne10,900-10,861

Perforations

Perforated and open-hole intervals.

FromToType
11,91311,938Perforated
11,94211,946Perforated
12,00412,007Perforated
12,34712,353Perforated
12,35512,360Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,00217.53,550 S
9.6258,55212.25850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 29, 2013Jan 4, 2013—
00Mar 21, 2013Oct 19, 2012—
00Mar 20, 2013Jul 24, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24532728, documented in the API reference.