TEXAS · WELLS · JEFFERSON COUNTY · GRAHAM TRUST LEASE · API 42-245-32728 · DISTRICT 03
Graham Trust #1
Jefferson County · Rebel (Yegua) field · Producing · Directional
Graham Trust #1 (API 42-245-32728) is a well in Jefferson County operated by Hilcorp Energy Company, completed November 2, 2012 and listed as producing on the RRC schedule, shut in August 1, 2026.
The RRC has issued one drilling permit (amended once), issued March 5, 2012, permitted to 12,285 ft.
It was permitted by Samson Exploration, LLC and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 5 formation tops, including Anahuac, Frio, Vicksburg, Jackson.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Samson Exploration, LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Jan 2026 |
| Latest permit | Samson Exploration, LLCMar 5, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,285
- total depth, ft
- 2
- permits on file
- Mar 5, 2012
- last permit issued
- Nov 2, 2012
- completed
- 0
- cumulative oil, bbl
- 851K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 2, 2012
- Shut in
- Aug 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham Trust G-3-266641 | Rebel (Yegua) | Hilcorp Energy Company | 1 | 0 | 851K | Jun 2012 – Jul 2026 |
Gas, mcf lease total
Last 12 months 25,145 · prior 12 34,250(-27%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Exploration, LLCJun 2012 → Aug 2016
- 2Hilcorp Energy CompanySep 2016 → Jan 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 734391-98 | Drill | Samson Exploration, LLC | Jul 26, 2012 | Mar 5, 2012 | Mar 30, 2012 | 13,500 |
| 734391-99 | Drill | Samson Exploration, LLC | Feb 22, 2012 | Mar 5, 2012 | Mar 30, 2012 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 2, 2012 | Graham Trust G-3-266641 | Rebel (Yegua) | Hilcorp Energy Company | Producing · shut in Aug 1, 2026 | 12,285 |
Formation tops
As filed on W-2/G-1. Subsea from 39 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,913 | 11,938 | Perforated |
| 11,942 | 11,946 | Perforated |
| 12,004 | 12,007 | Perforated |
| 12,347 | 12,353 | Perforated |
| 12,355 | 12,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 4,002 | 17.5 | 3,550 S |
| 9.625 | 8,552 | 12.25 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 29, 2013 | Jan 4, 2013 | — |
| 00 | Mar 21, 2013 | Oct 19, 2012 | — |
| 00 | Mar 20, 2013 | Jul 24, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-245-32728 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-245-32728 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24532728, documented in the API reference.