WELL · 42-247-31500 · DISTRICT 4
Mestena Oil & Gas Company #1
Jim Hogg County · San Pablo field · Vertical
Mestena Oil & Gas Company #1 (API 42-247-31500) is a plugged well in Jim Hogg County, plugged April 15, 2010, last operated by Mestena Operating L.L.C..
The RRC has issued 2 drilling permits between 1982 and 1994, permitted to 6,010 ft.
It was permitted by Mestena, Inc. and has since transferred to Mestena Operating L.L.C. on the wellbore schedule.
Operator of record
Permitted by Mestena, Inc.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 26, 2014
- Permits on file
- 17
- Phone
- (361) 884-2191
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mestena Operating L.L.C. |
| Production reports | none |
| Latest permit | Mestena, Inc.Nov 23, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,010
- total depth, ft
- 2
- permits on file
- Nov 23, 1994
- last permit issued
- Feb 8, 1995
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1995 THROUGH Jun 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 8, 1995
- Shut in
- —
- Plugged
- Apr 15, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mestena Oil & Gas Company O-4-12431 | San Pablo | Mestena Operating, L.L.C. | 1 | 0 | 0 | Feb 1995 – Jun 2010 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430328-99 | Reenter | Mestena, Inc. | Nov 23, 1994 | Nov 23, 1994 | Feb 6, 1995 | 6,010 |
| 177088-99 | Drill | Alta Vista Exploration, Inc. | Nov 10, 1982 | Nov 10, 1982 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-4-12431 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,810 | 2,830 | Perforated |
| 3,829 | 3,845 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 315 | 13.75 | 300 S |
| 2.375 | 3,853 | — | — |
| 4.5 | 4,182 | 7.875 | 970 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 1995 | Feb 16, 1995 | — |
| 00 | Mar 1, 1995 | — | — |
| 00 | Jan 12, 1984 | Apr 12, 1983 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-247-31500 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-247-31500 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 96.9K
- bbl, last 12 reported months
- 3.75M
- bbl, all reported
- Aug 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000082272 | W-14 Disposal | Plugged Apr 22, 2010 | 2,000 | 500 | 2,810–2,830 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 96,891 · prior 12 278,278(-65%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24731500, documented in the API reference.