WELL · 42-247-31587 · DISTRICT 4

East A. K. Fee #28

Plugged

Jim Hogg County · Black Diamond East (Pettus) field  · Vertical

East A. K. Fee #28 (API 42-247-31587) is a plugged well in Jim Hogg County, plugged December 20, 2021, last operated by Allegiant Resources LLC.

The RRC has issued one drilling permit, issued May 15, 1984, permitted to 4,820 ft.

It was permitted by Texaco Inc. and has since transferred to Allegiant Resources LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Cole Sand, Chernosky Sand, Gov'T. Wells Sand, Yegua.

Its lease has reported 136K barrels of oil and 285K mcf of gas since January 1993, last reporting in May 2022. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Allegiant Resources LLC

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Lafayette, LA
P-5 status
Active (A)
P-5 last filed
Jul 22, 2025
Permits on file
46
Phone
(337) 769-0032

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAllegiant Resources LLC
Production reportsFrostwood Energy, LLCthrough Dec 2020
Latest permitTexaco Inc.May 15, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,820
total depth, ft
1
permits on file
May 15, 1984
last permit issued
Dec 7, 1992
completed
136K
cumulative oil, bbl
285K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 7, 1992
Shut in
—
Plugged
Dec 20, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East, A. K. Fee O-4-9380Black Diamond, East (Pettus)Allegiant Resources, LLC5136K285KJan 1993 – May 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Jun 2003
  3. 3Future Petroleum Company LLCJul 2003 → Jun 2013
  4. 4Taos Resources Operating Co LLCJul 2013 → Aug 2016
  5. 5Frostwood Energy, LLCSep 2016 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
238776-99DrillTexaco Inc.May 14, 1984May 15, 1984Jun 18, 19844,820

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-9380————

Formation tops

As filed on W-2/G-1. Subsea from 555 ft elevation.Download CSV →

FormationMD ftSubsea
Cole Sand3,100-2,545
Chernosky Sand3,550-2,995
Gov't. Wells Sand3,850-3,295
YeguaTOP OF YEGUA4,500-3,945
Pettus Sand4,550-3,995

Perforations

Perforated and open-hole intervals.

FromToType
4,6464,731Perforated
4,7244,731Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62555212.25347 S
5.54,2807.875342 S
5.54,8207.875790 sx
5.5—7.875438 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 1, 1993Jan 13, 1993—
00Aug 24, 1984Jul 20, 1984—
00Aug 18, 1984Jul 20, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24731587, documented in the API reference.