TEXAS · WELLS · JIM HOGG COUNTY · HOLBEIN TRUST LEASE · API 42-247-32139 · DISTRICT 04

Holbein Trust #2

Y

Jim Hogg County · Thompsonville NE. (12500) field · Producing  · Vertical

Holbein Trust #2 (API 42-247-32139) is a well in Jim Hogg County operated by Columbus Energy LLC, completed March 15, 2000 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 2, 1999, permitted to 13,423 ft.

It was permitted by Vastar Resources, Inc. and has since transferred to Columbus Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including 1st Hinnant, 2nd Hinnant, 4th Hinnant.

Its lease has reported 110 barrels of oil and 3.47M mcf of gas since March 2000, last reporting volume in April 2026.

Operator of record

Columbus Energy LLC

Permitted by Vastar Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 2, 2026
Permits on file
51
Phone
(832) 432-8540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleColumbus Energy LLC
Production reportsColumbus Energy, LLCthrough Apr 2026
Latest permitVastar Resources, Inc.Nov 2, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,423
total depth, ft
1
permits on file
Nov 2, 1999
last permit issued
Mar 15, 2000
completed
110
cumulative oil, bbl
3.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 15, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holbein Trust G-4-176745Thompsonville, NE. (12500)Columbus Energy, LLC11103.47MMar 2000 – Apr 2026

Gas, mcf lease total

Last 12 months 3,439 · prior 12 9,368(-63%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Vastar Resources, Inc.Mar 2000 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → May 2011
  3. 3Columbus Energy, LLCJun 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489068-99DrillVastar Resources, Inc.Nov 2, 1999Nov 2, 1999Dec 20, 199915,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 15, 2000Holbein Trust G-4-176745Thompsonville NE. (12500)Columbus Energy LLCProducing13,423

Formation tops

As filed on W-2/G-1. Subsea from 791 ft elevation.Download CSV →

FormationMD ftSubsea
1ST Hinnant940-149
2ND Hinnant10,060-9,269
4TH Hinnant11,910-11,119

Perforations

Perforated and open-hole intervals.

FromToType
13,19813,222Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161,015201,070 S
11.757,50014.75570 S
9.6259,45210.625225 S
5.513,4236.5310 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 8, 2000Mar 28, 2000Yes
00May 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24732139, documented in the API reference.