TEXAS · WELLS · JIM WELLS COUNTY · REHMET -A- LEASE · API 42-249-01076 · DISTRICT 04
Rehmet -A- #1
Jim Wells County · Tecolote West (2200) field · Vertical
Rehmet -A- #1 (API 42-249-01076) is a plugged well in Jim Wells County, plugged September 17, 1996, last operated by Hls Producing Inc..
The RRC has issued one drilling permit, issued June 23, 1981, permitted to 5,316 ft.
It was permitted by Grace Petroleum Corp. and has since transferred to Hls Producing Inc. on the wellbore schedule.
Operator of record
Permitted by Grace Petroleum Corp.; the EWA schedule now lists a different operator.
- Based in
- Corpus Chrsti, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Dec 3, 1993
- Phone
- (512) 881-5022
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | HLS Producing Inc. |
| Production reports | none |
| Latest permit | Grace Petroleum Corp.Jun 23, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,316
- total depth, ft
- 1
- permits on file
- Jun 23, 1981
- last permit issued
- May 11, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 11, 1981
- Shut in
- —
- Plugged
- Sep 17, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rehmet -A- G-4-60979 | Tecolote, West (2200) | HLS Producing, Inc. | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 122010-99 | Recompletion | Grace Petroleum Corp. | Jun 23, 1981 | Jun 23, 1981 | — | 5,316 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 11, 1981 | Rehmet -A- G-4-60979 | Tecolote West (2200) | HLS Producing Inc. | Plugged | — |
| Jun 1, 1967 | Hoffhines Gertrude G-4-42332 | Tecolote West (4000) | Yarborough W. B. | Plugged | — |
| Apr 1, 1963 | Hoffhines Gertrude G-4-14606 | Tecolote West (3500) | Yarborough W. B. | Plugged | — |
| Apr 1, 1963 | Hoffhines Gertrude G-4-14603 | Tecolote West (Bierstadt) | Yarborough W. B. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,531 | 2,534 | Perforated |
| 3,521 | 3,523 | Perforated |
| 4,080 | 4,084 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 722 | — | — |
| 2.375 | 2,450 | — | — |
| 4.5 | 5,310 | 9.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Feb 20, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-01076 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-01076 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24901076, documented in the API reference.