WELL · 42-249-01896 · DISTRICT 4
Collard Tom Gas Unit #1
Jim Wells County · Magnolia City West (Frio -A-) field · Vertical
Collard Tom Gas Unit #1 (API 42-249-01896) is a plugged well in Jim Wells County, plugged April 23, 1993, last operated by Verado Energy Inc..
The RRC has issued one drilling permit, issued December 22, 1983, permitted to 5,755 ft.
It was permitted by Gulf Coast Venture and has since transferred to Verado Energy Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Sulphur Sand, Perez Sand, Frio, Vicksburg.
Operator of record
Permitted by Gulf Coast Venture; the EWA schedule now lists a different operator.
- Based in
- Allen, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 30, 2025
- Permits on file
- 193
- Phone
- (214) 368-5322
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Verado Energy, Inc.through Jan 1993 |
| Latest permit | Gulf Coast VentureDec 22, 1983 |
- 5,755
- total depth, ft
- 1
- permits on file
- Dec 22, 1983
- last permit issued
- Sep 16, 1983
- completed
- 0
- cumulative oil, bbl
- 620
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 16, 1983
- Shut in
- —
- Plugged
- Apr 23, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Collard, Tom Gas Unit G-4-108633 | Magnolia City, West (Frio -A-) | Verado Energy, Inc. | 1 | 0 | 620 | Jan 1993 – Jul 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Verado Energy, Inc.Jan 1993 → Jan 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 201758-99 | Recompletion | Gulf Coast Venture | Oct 20, 1983 | Dec 22, 1983 | — | 5,755 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 16, 1983 | Collard Tom Gas Unit G-4-108633 | Magnolia City West (Frio -A-) | Verado Energy Inc. | Plugged | — |
| — | — G-4-11762 | — | — | Plugged | — |
| — | Collard Tom Gas Unit G-4-35053 | Magnolia City West (Frio -B-) | Gulf Coast Venture | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 165 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,629 | 4,643 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 222 | 12.25 | 100 S |
| 9.625 | 222 | — | — |
| 5.5 | 5,272 | 8.75 | 400 S |
| 5.5 | 5,272 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 1984 | Sep 28, 1983 | — |
| 00 | Jan 26, 1984 | Sep 28, 1983 | — |
| 00 | Jan 12, 1984 | Jan 21, 1965 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-01896 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-01896 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24901896, documented in the API reference.