WELL · 42-249-02734 · DISTRICT 4
Seeligson A. A. #18
Jim Wells County · Seeligson (Zone 22-5) field · Vertical
Seeligson A. A. #18 (API 42-249-02734) is a well in Jim Wells County operated by Mobil Producing TX. & N.M. Inc., completed January 27, 1989.
The RRC has issued 2 drilling permits between 1988 and 2000, permitted to 6,584 ft.
Its 3 leases have reported 124K barrels of oil and 994K mcf of gas since January 1993, last reporting in July 2026. The leases carry 18 wells, so these are lease totals, not this well alone.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | Sue-Ann Operating, L.C.through Apr 2026 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Oct 31, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,584
- total depth, ft
- 2
- permits on file
- Oct 31, 2000
- last permit issued
- Jan 27, 1989
- completed
- 124K
- cumulative oil, bbl
- 994K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 27, 1989
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Seeligson, A.A. G-4-129981 | Seeligson (Zone 20-H-01) | Sue-Ann Operating, L.C. | 1 | 0 | 20.8K | Jan 1993 – Jul 2026 |
| Seeligson, A.A. O-4-12454 | Seeligson (Consolidated) | Sue-Ann Operating, L.C. | 9 | 43.6K | 264K | Apr 1995 – Jul 2026 |
| Seeligson, A. A. O-4-2795 | Seeligson (Zone 22-5) | Mobil Producing TX. & N.M. Inc. | 8 | 80.1K | 710K | Jan 1993 – Jun 1996 |
Oil, barrels lease total
Last 12 months 806 · prior 12 876(-8%)
Gas, mcf lease total
Last 12 months 17 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jul 2012
- 2Jetta Operating Company, Inc.Nov 2017 → Jun 2020
- 3Sue-Ann Operating, L.C.Sep 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 501430-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Oct 31, 2000 | Oct 31, 2000 | — | 6,550 |
| 346422-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 11, 1988 | May 12, 1988 | — | 6,584 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-129981 | — | — | — | — |
| — | — O-4-2795 | — | — | — | — |
| — | — O-4-12454 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,092 | 6,106 | Perforated |
| 6,125 | 6,143 | Perforated |
| 6,537 | 6,547 | Perforated |
| 6,550 | 6,553 | Perforated |
| 6,554 | 6,560 | Perforated |
| — | 6,560 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,161 | 12 | 1,000 S |
| 10.75 | 2,161 | — | — |
| 2.375 | 6,400 | — | 66 S |
| 7 | 6,584 | 8.625 | 1,000 S |
| 7 | 6,584 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 9, 2003 | Oct 18, 2002 | — |
| 00 | Jun 11, 1996 | Mar 6, 1989 | Yes |
| 00 | Apr 20, 1989 | Mar 6, 1989 | Yes |
| 00 | Apr 4, 1989 | Mar 6, 1989 | Yes |
| 00 | Mar 24, 1989 | Jul 18, 1986 | — |
| 00 | Mar 10, 1989 | — | — |
| 00 | Jul 29, 1986 | Jul 18, 1986 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-02734 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-02734 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24902734, documented in the API reference.