WELL · 42-249-02813 · DISTRICT 4

Seeligson Unit #0100A

Shut in

Jim Wells County · Seeligson (Combined Zones) field · Temp Abandoned  · Vertical

Seeligson Unit #0100A (API 42-249-02813) is a well in Jim Wells County operated by Sue-Ann Operating L.C., completed December 21, 1988 and listed as temp abandoned on the RRC schedule, shut in May 1, 2021.

The RRC has issued 3 drilling permits between 1984 and 1988, permitted to 6,252 ft.

It was permitted by Sun Exploration & Production CO. and has since transferred to Sue-Ann Operating L.C. on the wellbore schedule.

Completion filings report 3 formation tops, including Zone 15, Zone 20-C-44, Zone 20-F.

No lease production has been reported under this well’s leases.

Operator of record

Sue-Ann Operating L.C.

Permitted by Sun Exploration & Production Co.; the EWA schedule now lists a different operator.

Based in
Victoria, TX
P-5 status
Active (A)
P-5 last filed
May 8, 2026
Permits on file
380
Phone
(361) 576-6090

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSue-Ann Operating, L.C.through Apr 2021
Latest permitSun Exploration & Production Co.Nov 3, 1988
6,252
total depth, ft
3
permits on file
Nov 3, 1988
last permit issued
Dec 21, 1988
completed
0
cumulative oil, bbl
1.11M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 21, 1988
Shut in
May 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seeligson Unit G-4-129597Seeligson (Zone 15)Sue-Ann Operating, L.C.101.11MJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyJan 1993 → Apr 1995
  2. 2Triad Energy CorporationMay 1995 → Oct 2011
  3. 3Jetta Operating Company, Inc.Nov 2011 → Aug 2020
  4. 4Sue-Ann Operating, L.C.Sep 2020 → Apr 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
352847-99RecompletionSun Exploration & Production Co.Oct 31, 1988Nov 3, 1988—6,252
341425-99RecompletionMobil Producing TX. & N.M. Inc.Jan 14, 1988Jan 14, 1988—6,040
238063-99RecompletionMobil Producing TX. & N.M. Inc.May 7, 1984May 8, 1984—6,040

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 21, 1988Seeligson Unit G-4-129597Seeligson (Combined Zones)Sue-Ann Operating L.C.Temp Abandoned · shut in May 1, 20216,252
Mar 20, 1981Seeligson A. A. G-4-93373Seeligson (Zone 20-F)Mobil Producing TX. & N.M. Inc.Not on Schedule—
Jun 27, 1947Seeligson Unit G-4-32512Seeligson (Zone 20-C-44)Sun Exploration & Production Co.Not on Schedule—
—Seeligson A. A. O-4-2759Seeligson (Zone 20-F)Mobil Producing TX. & N.M. Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 133 ft elevation.Download CSV →

FormationMD ftSubsea
Zone 155,334-5,201
Zone 20-C-446,070-5,937
Zone 20-F6,202-6,069

Perforations

Perforated and open-hole intervals.

FromToType
5,3345,359Perforated
6,0756,080Perforated
6,1846,207Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,01615700 S
76,2509.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 1989Jan 23, 1989Yes
00Feb 3, 1989——
00Jan 12, 1984May 4, 1981—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 1987
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052932W-14 DisposalCanceled Oct 26, 19894,5001,7503,500–4,200

MONTHLY INJECTED, BBL · H-10 · LAST 2 REPORTED MONTHS

Last 12 months 0

011987

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24902813, documented in the API reference.