WELL · 42-249-03523 · DISTRICT 4
Blucher C. F. H. #34
Jim Wells County · Tijerina-Canales-Blucher field · Vertical
Blucher C. F. H. #34 (API 42-249-03523) is a plugged well in Jim Wells County, plugged January 30, 1991, last operated by Logas Energy LLC.
The RRC has issued 3 drilling permits between 1981 and 1988, permitted to 6,671 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Logas Energy LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Kill-Mar, Arnellez.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Lafayette, LA
- P-5 status
- Active (A)
- P-5 last filed
- Dec 9, 2025
- Permits on file
- 4
- Phone
- (337) 989-8119
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Logas Energy LLC |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.Apr 13, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,671
- total depth, ft
- 3
- permits on file
- Apr 13, 1988
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 30, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-116929 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 345014-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Apr 11, 1988 | Apr 13, 1988 | — | 6,503 |
| 269058-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jun 3, 1985 | Mar 8, 1985 | — | 6,671 |
| 146885-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Dec 31, 1981 | Dec 31, 1981 | — | 6,671 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-116929 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 143 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Kill-Mar | 6,305 | -6,162 |
| Arnellez | 6,528 | -6,385 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,478 | 6,485 | Perforated |
| 6,528 | 6,538 | Perforated |
| 6,655 | 6,669 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,526 | — | 400 S |
| 2.375 | 6,506 | — | — |
| 5.5 | 6,785 | — | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 1988 | Jun 10, 1988 | — |
| 00 | Jul 9, 1985 | Jun 12, 1985 | — |
| 00 | Jun 29, 1985 | — | — |
| 00 | Jan 12, 1984 | May 10, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-03523 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-03523 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24903523, documented in the API reference.