TEXAS · WELLS · JIM WELLS COUNTY · API 42-249-30093 · DISTRICT 04
King Ranch Stratton #A 51
Jim Wells County · Stratton (Consolidated) field · Vertical
King Ranch Stratton #A 51 (API 42-249-30093) is a plugged well in Jim Wells County, plugged August 9, 2000, last operated by Exxon Mobil Corporation.
The RRC has issued 3 drilling permits between 1985 and 1996, permitted to 6,410 ft.
It was permitted by Exxon Corp. and has since transferred to Exxon Mobil Corporation on the wellbore schedule.
Operator of record
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 15, 2026
- Permits on file
- 1,223
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | Exxon Corp.through May 1998 |
| Latest permit | Exxon Corp.May 21, 1996 |
- 6,410
- total depth, ft
- 3
- permits on file
- May 21, 1996
- last permit issued
- Jun 26, 1996
- completed
- 0
- cumulative oil, bbl
- 291K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 26, 1996
- Shut in
- —
- Plugged
- Aug 9, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| King Ranch Stratton G-4-139017 | Stratton (Bertram B) | Exxon Mobil Corporation | 1 | 0 | 110K | Jan 1993 – Nov 2008 |
| King Ranch Stratton G-4-159088 | Stratton (Consolidated) | Exxon Mobil Corporation | 1 | 0 | 181K | Jun 1996 – Aug 2000 |
| — G-4-116825 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → May 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 448367-99 | Recompletion | Exxon Corp. | May 21, 1996 | May 21, 1996 | May 20, 1996 | 6,163 |
| 388744-99 | Recompletion | Exxon Corp. | Jun 6, 1991 | Jun 10, 1991 | Jun 23, 1991 | 6,410 |
| 272582-99 | Recompletion | Exxon Corp. | May 31, 1985 | Apr 16, 1985 | — | 6,410 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 26, 1996 | King Ranch Stratton G-4-159088 | Stratton (Consolidated) | Exxon Mobil Corporation | Plugged | — |
| Jul 20, 1991 | King Ranch Stratton G-4-139017 | Stratton (Bertram B) | Exxon Mobil Corporation | Plugged | — |
| May 17, 1985 | King Ranch Stratton G-4-116825 | Stratton (Consolidated) | Exxon Corp. | Plugged | — |
| — | King Ranch Stratton O-4-7657 | Stratton (Wardner West) | Exxon Corp. | Plugged | — |
| — | King Ranch Stratton G-4-62678 | Stratton (G-22) | Exxon Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,026 | 5,032 | Perforated |
| 5,294 | 5,308 | Perforated |
| 5,336 | 5,344 | Perforated |
| 6,136 | 6,143 | Perforated |
| — | 6,325 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,160 | 11 | 315 S |
| 8.625 | 1,660 | 11 | 315 S |
| 2.875 | 6,393 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 5, 1996 | Jul 18, 1996 | Yes |
| 00 | Jul 31, 1996 | — | — |
| 00 | Sep 27, 1991 | Aug 15, 1991 | Yes |
| 00 | Aug 27, 1991 | — | — |
| 00 | Mar 29, 1991 | Aug 30, 1990 | — |
| 00 | Jun 27, 1985 | Jun 13, 1985 | — |
| 00 | Jun 21, 1985 | — | — |
| 00 | Jan 12, 1984 | Jun 24, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-30093 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-30093 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24930093, documented in the API reference.