TEXAS · WELLS · JIM WELLS COUNTY · API 42-249-30982 · DISTRICT 04
Mosser H.J. #1
Jim Wells County · Tecolote West (Bierstadt) field · Vertical
Mosser H.J. #1 (API 42-249-30982) is a plugged well in Jim Wells County, plugged July 20, 1981, last operated by 588985 - Name Unknown.
The RRC has issued 3 drilling permits between 1978 and 1980, permitted to 5,410 ft.
It was permitted by Moore Oil & Gas Ventures and has since transferred to 588985 - Name Unknown on the wellbore schedule.
Operator of record
Permitted by Moore Oil & Gas Ventures; the EWA schedule now lists a different operator.
- Based in
- Unknown, XX
- P-5 status
- Inactive (I)
- Permits on file
- 3
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Moore Oil & Gas VenturesDec 31, 1980 |
- 5,410
- total depth, ft
- 3
- permits on file
- Dec 31, 1980
- last permit issued
- Dec 23, 1979
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 23, 1979
- Shut in
- —
- Plugged
- Jul 20, 1981
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 103630-99 | Recompletion | Moore Oil & Gas Ventures | Dec 31, 1980 | Dec 31, 1980 | — | 5,410 |
| 45747-99 | Recompletion | Moore Oil & Gas Ventures | Apr 4, 1979 | Apr 4, 1979 | — | 5,410 |
| 38677-99 | Drill | Moore Oil & Gas Ventures | Dec 12, 1978 | Dec 12, 1978 | Dec 18, 1978 | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 23, 1979 | Mosser H.J. G-4-80647 | Tecolote West (Bierstadt) | 588985 - Name Unknown | Plugged | — |
| Mar 20, 1979 | Moosser H.J. G-4-81408 | Reynolds Ranch (Stillwell) | Moore Oil & Gas Ventures | Plugged | — |
| Dec 23, 1978 | Mosser H. J. G-4-91373 | Tecolote West (Bierstadt) | Moore Oil & Gas Ventures | Plugged | — |
| Dec 23, 1978 | Mosser H. V. G-4-80648 | Tecolote East (4800) | Moore Oil & Gas Ventures | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,921 | 4,924 | Perforated |
| 4,962 | 5,247 | Perforated |
| 4,962 | 5,386 | Perforated |
| 5,242 | 5,247 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 522 | 12.25 | 350 S |
| 2.375 | 4,895 | — | — |
| 2.375 | 4,940 | — | — |
| 2.375 | 5,145 | — | — |
| 4.5 | 5,386 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 23, 1981 | — |
| 00 | Jan 12, 1984 | Mar 30, 1979 | — |
| 00 | Jan 12, 1984 | Feb 14, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-30982 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-30982 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000088485 | W-14 Disposal | Plugged Oct 30, 1981 | 250 | 0 | 2,817–2,822 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24930982, documented in the API reference.