WELL · 42-249-31686 · DISTRICT 4

Garcia J. #1

Plugged

Jim Wells County · Palito Blanco (Yegua 7450) field  · Vertical

Garcia J. #1 (API 42-249-31686) is a plugged well in Jim Wells County, plugged September 20, 1995, last operated by Mueller Engineering Corp..

The RRC has issued 2 drilling permits between 1983 and 1992, permitted to 8,500 ft.

Completion filings report 4 formation tops, including Miocene (undifferentiated), Frio, Jackson, Yegua.

Operator of record

Mueller Engineering Corp.

Based in
Corpus Chrsti, TX
P-5 status
Inactive (I)
P-5 last filed
Jul 13, 2001
Permits on file
236
Phone
(361) 883-1911

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMueller Engineering Corp.
Production reportsMueller Engineering Corp.through Sep 1995
Latest permitMueller Engineering Corp.Dec 31, 1992
8,500
total depth, ft
2
permits on file
Dec 31, 1992
last permit issued
Mar 25, 1992
completed
0
cumulative oil, bbl
119K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 1992
Shut in
—
Plugged
Sep 20, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia, J. G-4-143926Braman (Yegua 6)Mueller Engineering Corp.10119KJan 1993 – Apr 1996
Garcia, J. G-4-107430Palito Blanco (Yegua 7450)Mueller Engineering Corp.100Jan 1993 – Sep 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jan 1993 → Sep 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407849-99RecompletionMueller Engineering Corp.Jan 4, 1993Dec 31, 1992Dec 16, 19928,250
196688-99DrillHarwood Exploration, Inc.May 27, 1983May 27, 1983May 31, 19838,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-107430————
—— G-4-143926————

Formation tops

As filed on W-2/G-1. Subsea from 254 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE1253
Frio3,000-2,746
Jackson4,800-4,546
Yegua6,000-5,746

Perforations

Perforated and open-hole intervals.

FromToType
4,9634,966Perforated
5,0885,091Perforated
7,3047,306Perforated
7,3567,358Perforated
7,4477,448Perforated
7,4477,455Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,84514.75976 S
7.6256,4369.875825 S
27,320——
4.58,2506.5400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 1995Jun 14, 1995—
00Mar 3, 1993Jan 6, 1993Yes
00Feb 23, 1993——
00Apr 27, 1992Apr 8, 1992—
00Jan 12, 1984Jul 13, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24931686, documented in the API reference.