TEXAS · WELLS · JIM WELLS COUNTY · G-4-126442 LEASE · API 42-249-31874 · DISTRICT 04

Dostal G.U. -A- #1

Plugged

Jim Wells County · Bentonville South (Kohler) field  · Vertical

Dostal G.U. -A- #1 (API 42-249-31874) is a plugged well in Jim Wells County, plugged April 26, 1990, last operated by Virtex Petroleum Company Inc..

The RRC has issued 4 drilling permits (amended twice) between 1985 and 1988, permitted to 6,900 ft.

It was permitted by Txo Production Corp. and has since transferred to Virtex Petroleum Company Inc. on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Virtex Petroleum Company Inc.

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Corpus Chrsti, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 10, 2007
Permits on file
220
Phone
(361) 882-3046

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVirtex Petroleum Company Inc.
Production reportsnone
Latest permitTXO Production Corp.Apr 22, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
6
permits on file
Apr 22, 1988
last permit issued
Oct 23, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 23, 1987
Shut in
—
Plugged
Apr 26, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-4-126442——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
345456-99RecompletionTXO Production Corp.Apr 20, 1988Apr 22, 1988—6,900
332165-98RecompletionTXO Production Corp.Dec 28, 1987Jun 29, 1987—6,900
332165-99RecompletionTXO Production Corp.Jun 26, 1987Jun 29, 1987—6,900
328559-98RecompletionTXO Production Corp.Apr 13, 1987Apr 6, 1987—6,900
328559-99RecompletionTXO Production Corp.Apr 2, 1987Apr 6, 1987—6,900
269386-99DrillTXO Production Corp.Mar 11, 1985Mar 12, 1985Mar 24, 19856,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 23, 1987Dostal G.U. -A- G-4-126442Bentonville South (Kohler)Virtex Petroleum Company Inc.Plugged—
Apr 10, 1987Dostal Oil Unit -A- O-4-11214Bentonville (6100)TXO Production Corp.Plugged—
Apr 15, 1985Dostal Gas Unit A G-4-116449Bentonville South (6290)TXO Production Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 149 ft elevation.Download CSV →

FormationMD ftSubsea
Frio4,800-4,651
FrioTOP OF FRIO4,800-4,651

Perforations

Perforated and open-hole intervals.

FromToType
5,2845,292Perforated
6,1686,171Perforated
6,2886,294Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,21912.25544 S
4.56,4007.875660 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 11, 1988Feb 9, 1988Yes
00Mar 30, 1988——
00May 11, 1987Apr 21, 1987Yes
00Apr 30, 1987——
00Jun 17, 1985Apr 22, 1985—
00Jun 13, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24931874, documented in the API reference.