TEXAS · WELLS · JIM WELLS COUNTY · DE TIJERINA, H.C. LEASE · API 42-249-31904 · DISTRICT 04

De Tijerina H.C. #107

Y

Jim Wells County · T-C-B (Vxbg Consolidated) field · Producing  · Vertical

Fields on the latest permit · any of 3
Tijerina-Canales-Blucher ( 21-J) · Tijerina-Canales-Blucher (8520) · T-C-B, West (9900)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

De Tijerina H.C. #107 (API 42-249-31904) is a well in Jim Wells County operated by Remora Operating LLC, completed November 14, 1985 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 11,500 ft.

It was permitted by Texaco Inc. and has since transferred to Remora Operating LLC on the wellbore schedule.

Its lease has reported 121 barrels of oil and 22.2K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

Remora Operating LLC

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 1, 2026
Permits on file
2
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemora Operating LLC
Production reportsRemora Operating, LLCthrough Apr 2026
Latest permitTexaco Inc.Jan 20, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
2
permits on file
Jan 20, 1986
last permit issued
Nov 14, 1985
completed
121
cumulative oil, bbl
22.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 14, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Hearing (H)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
De Tijerina, H.C. G-4-119842T-C-B (Vxbg Consolidated)Remora Operating, LLC112122.2KJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 1,065 · prior 12 1,785(-40%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Freedom Energy, Inc. (I)May 1993 → Sep 1994
  2. 2Axio Production Company, L.P.Oct 2003 → Oct 2005
  3. 3Chesapeake Operating, Inc.May 2008 → Jun 2012
  4. 4Remora Operating, LLCJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
296017-99DrillTexaco Inc.Dec 12, 1985Jan 20, 1986—11,500
279108-99DrillTexaco Inc.Jul 12, 1985Jul 1, 1985Aug 10, 198511,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 14, 1985De Tijerina H.C. G-4-119842T-C-B (Vxbg Consolidated)Remora Operating LLCProducing11,500

Perforations

Perforated and open-hole intervals.

FromToType
7,4987,502Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
201,395261,950 S
13.6257,040143,800 S
5.511,0006.5550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 11, 1986Jan 17, 1986Yes
00Feb 7, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24931904, documented in the API reference.