WELL · 42-249-31956 · DISTRICT 4

Gomez C #2

Plugged

Jim Wells County · Caro Creek (Yegua 7270) field  · Vertical

Gomez C #2 (API 42-249-31956) is a plugged well in Jim Wells County, plugged April 6, 1995, last operated by Reserve Operating Corp..

The RRC has issued one drilling permit, issued January 27, 1986, permitted to 8,000 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Reserve Operating Corp. on the wellbore schedule.

Completion filings report 7 formation tops, including Vicksburg, Jackson, Yegua, Dy.

Operator of record

Reserve Operating Corp.

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 30, 2026
Permits on file
24
Phone
(713) 783-8851

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleReserve Operating Corp.
Production reportsReserve Operating Corp.through Apr 1995
Latest permitFina Oil & Chemical CompanyJan 27, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Jan 27, 1986
last permit issued
Mar 28, 1986
completed
0
cumulative oil, bbl
13K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 1986
Shut in
—
Plugged
Apr 6, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gomez "C" G-4-120933Caro Creek (Yegua 7270)Reserve Operating Corp.1013KJan 1993 – Apr 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reserve Operating Corp.Jan 1993 → Apr 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
296219-99DrillFina Oil & Chemical CompanyJan 27, 1986Jan 27, 1986Feb 23, 19868,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-120933————

Formation tops

As filed on W-2/G-1. Subsea from 253 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg5,000-4,747
Jackson5,750-5,497
Yegua6,400-6,147
DY6,800-6,547
DY 16,900-6,647
DY 27,150-6,897
DY 37,350-7,097

Perforations

Perforated and open-hole intervals.

FromToType
7,2737,278Perforated
7,3187,322Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7577414.75420 S
7.6255,6789.875330 S
4.57,6746.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1986Apr 25, 1986Yes
00May 9, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24931956, documented in the API reference.