TEXAS · WELLS · JIM WELLS COUNTY · API 42-249-32291 · DISTRICT 04

Scott & Hernandez Unit 1 #2

Shut in

Jim Wells County · La Gloria (Jordan) field · Shut In-Multi-Compl  · Vertical

Scott & Hernandez Unit 1 #2 (API 42-249-32291) is a well in Jim Wells County operated by Bzg E&P LLC, completed July 23, 1997 and listed as shut in-multi-compl on the RRC schedule, shut in December 1, 2021.

The RRC has issued one drilling permit, issued April 7, 1997, permitted to 8,200 ft.

It was permitted by Winn Exploration CO., Inc. and has since transferred to Bzg E&P LLC on the wellbore schedule.

Its 2 leases have reported 6.3K barrels of oil and 2.73M mcf of gas since July 1997, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

BZG E&P LLC

Permitted by Winn Exploration Co., Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 20, 2026
Phone
(281) 620-3583

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBZG E&P LLC
Production reportsFaulconer Energy, LLCthrough Nov 2021
Latest permitWinn Exploration Co., Inc.Apr 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,200
total depth, ft
1
permits on file
Apr 7, 1997
last permit issued
Jul 23, 1997
completed
6.3K
cumulative oil, bbl
2.73M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Nov 2021

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 23, 1997
Shut in
Dec 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scott & Hernandez Unit 1 G-4-164943La Gloria (Eloise)Faulconer Energy, LLC14.88K2.57MJul 1997 – Nov 2021
Scott & Hernandez Unit 1 G-4-164944La Gloria (Jordan)Faulconer Energy, LLC11.42K157KJul 1997 – Nov 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winn Exploration Co., Inc.Jul 1997 → Dec 2015
  2. 2Faulconer, Vernon E., Inc.Jan 2016 → Nov 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
460688-99DrillWinn Exploration Co., Inc.Apr 3, 1997Apr 7, 1997Jun 21, 19979,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 23, 1997Scott & Hernandez Unit 1 G-4-164944La Gloria (Jordan)BZG E&P LLCShut In-Multi-Compl · shut in Oct 1, 20008,200
Jul 14, 1997Scott & Hernandez Unit 1 G-4-164943La Gloria (Eloise)BZG E&P LLCTemp Abandoned · shut in Dec 1, 20218,200

Perforations

Perforated and open-hole intervals.

FromToType
7,5407,551Perforated
7,6237,633Perforated
7,9587,968Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62592512.25380 S
8.62593512.25380 S
5.58,1967.875397 S
5.58,1987.875397 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 5, 1997Sep 2, 1997Yes
00Oct 29, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24932291, documented in the API reference.