WELL · 42-249-32384 · DISTRICT 4

Villarreal Alonzo #1

Plugged

Jim Wells County · Amargosa (6000 Sand) field  · Vertical

Villarreal Alonzo #1 (API 42-249-32384) is a plugged well in Jim Wells County, plugged February 19, 2007, last operated by American Shoreline Inc..

The RRC has issued one drilling permit, issued October 17, 2000, permitted to 6,100 ft.

It was permitted by El Dorado Resources Inc. and has since transferred to American Shoreline Inc. on the wellbore schedule.

Its lease has reported 25 barrels of oil and 50 mcf of gas since February 2001, last reporting in March 2007.

Operator of record

American Shoreline Inc.

Permitted by EL Dorado Resources Inc.; the EWA schedule now lists a different operator.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
153
Phone
(361) 452-1966

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmerican Shoreline Inc.
Production reportsEL Dorado Resources Inc.through Feb 2001
Latest permitEL Dorado Resources Inc.Oct 17, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,100
total depth, ft
1
permits on file
Oct 17, 2000
last permit issued
Jan 8, 2001
completed
25
cumulative oil, bbl
50
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2001 THROUGH Mar 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 2001
Shut in
—
Plugged
Feb 19, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Villarreal, Alonzo O-4-12994Amargosa (6000 Sand)American Shoreline, Inc.12550Feb 2001 – Mar 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Dorado Resources Inc.Feb 2001 → Feb 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500772-99DrillEL Dorado Resources Inc.Oct 13, 2000Oct 17, 2000Dec 12, 20006,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-4-12994————

Perforations

Perforated and open-hole intervals.

FromToType
5,9175,922Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,50712.25605 S
4.56,1077.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 27, 2001Feb 21, 2001Yes
00Mar 19, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24932384, documented in the API reference.