WELL · 42-249-32400 · DISTRICT 4
Seeligson Estate #1
Jim Wells County · Premont East (Zone 18-A) field · Vertical
Seeligson Estate #1 (API 42-249-32400) is a plugged well in Jim Wells County, plugged April 9, 2019, last operated by Jetta Operating Company Inc..
The RRC has issued 4 drilling permits between 2001 and 2010, permitted to 6,000 ft.
It was permitted by Triad Energy Corporation and has since transferred to Jetta Operating Company Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Valentine Sand, Zone 18a, Shale, Wilcox.
Its 5 leases have reported 19.9K barrels of oil and 485K mcf of gas since October 2001, last reporting in April 2019. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Triad Energy Corporation; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 605
- Phone
- (817) 639-2332
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jetta Operating Company Inc. |
| Production reports | Jetta Operating Company, Inc.through May 2018 |
| Latest permit | Triad Energy CorporationJun 8, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 4
- permits on file
- Jun 8, 2010
- last permit issued
- Apr 17, 2013
- completed
- 19.9K
- cumulative oil, bbl
- 485K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Apr 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 2013
- Shut in
- —
- Plugged
- Apr 9, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Seeligson Estate G-4-218577 | Premont, East (Zone 16-A) | Jetta Operating Company, Inc. | 1 | 0 | 371K | Apr 2006 – Apr 2019 |
| Seeligson Estate G-4-254891 | Premont (McCartney Sand) | Jetta Operating Company, Inc. | 1 | 0 | 12.3K | Nov 2009 – Apr 2019 |
| Seeligson Estate G-4-269098 | Premont, East (Zone 18-A) | Jetta Operating Company, Inc. | 1 | 0 | 58K | Jul 2013 – Apr 2019 |
| Seeligson Estate O-4-13622 | Premont, East (Zone 18-A) | Jetta Operating Company, Inc. | 1 | 2.24K | 38.3K | Sep 2010 – Sep 2015 |
| Seeligson Estate No. 1 O-4-13059 | Premont, East (Zone 18-A) | Acock/Anaqua Operating Co., LP | 1 | 17.6K | 6.07K | Oct 2001 – Aug 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Flournoy Production Co.Oct 2001 → Dec 2002
- 2Dewbre Petroleum CorporationJan 2003 → May 2004
- 3Acock/Anaqua Operating Co., LPJun 2004 → Aug 2007
- 4Triad Energy CorporationSep 2007 → Oct 2011
- 5Jetta Operating Company, Inc.Jul 2013 → May 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 697151-99 | Recompletion | Triad Energy Corporation | Jun 7, 2010 | Jun 8, 2010 | Aug 24, 2010 | 6,000 |
| 678837-99 | Recompletion | Triad Energy Corporation | Feb 23, 2009 | Feb 25, 2009 | Jun 15, 2009 | 6,000 |
| 617531-99 | Recompletion | Acock/Anaqua Operating Co., LP | Apr 12, 2006 | Apr 13, 2006 | Jan 23, 2006 | 6,000 |
| 512126-99 | Drill | Flournoy Production Co. | Aug 1, 2001 | Aug 1, 2001 | Aug 18, 2001 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-218577 | — | — | — | — |
| — | — G-4-254891 | — | — | — | — |
| — | — G-4-269098 | — | — | — | — |
| — | — O-4-13059 | — | — | — | — |
| — | — O-4-13622 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 202 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Valentine Sand | 4,612 | -4,410 |
| Zone 18A | 4,730 | -4,528 |
| Shale | 6,000 | -5,798 |
| Wilcox | 11,221 | -11,019 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,746 | 3,754 | Perforated |
| 3,746 | 4,735 | Perforated |
| 3,758 | 3,762 | Perforated |
| 3,766 | 3,770 | Perforated |
| 3,845 | 3,850 | Perforated |
| 4,079 | 4,088 | Perforated |
| 4,612 | 4,615 | Perforated |
| 4,618 | 4,622 | Perforated |
| 4,730 | 4,735 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 803 | 12.25 | 310 S |
| 4.5 | 6,000 | 7.875 | 938 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2013 | Jul 31, 2013 | — |
| 00 | Oct 8, 2010 | Sep 20, 2010 | — |
| 00 | Sep 29, 2010 | — | — |
| 00 | May 17, 2010 | Dec 28, 2009 | Yes |
| 00 | Mar 8, 2010 | — | — |
| 00 | Jan 18, 2007 | Apr 25, 2006 | Yes |
| 00 | Aug 30, 2006 | — | — |
| 00 | Nov 29, 2001 | Nov 14, 2001 | Yes |
| 00 | Nov 20, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-32400 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-32400 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24932400, documented in the API reference.