WELL · 42-249-32531 · DISTRICT 4
Thompson #1
Jim Wells County · Orange Grove (4600) field · Vertical
Thompson #1 (API 42-249-32531) is a plugged well in Jim Wells County, plugged April 22, 2013, last operated by Kebo Oil & Gas Inc..
The RRC has issued one drilling permit, issued July 14, 2008, permitted to 6,000 ft.
It was permitted by Cummins & Walker Oil CO., Inc. and has since transferred to Kebo Oil & Gas Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Top Of Het.
Operator of record
Permitted by Cummins & Walker Oil Co., Inc.; the EWA schedule now lists a different operator.
- Based in
- Portland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 30, 2025
- Permits on file
- 537
- Phone
- (361) 643-8821
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kebo Oil & Gas Inc. |
| Production reports | Cummins & Walker Oil Co., Inc.through Mar 2010 |
| Latest permit | Cummins & Walker Oil Co., Inc.Jul 14, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Jul 14, 2008
- last permit issued
- Oct 18, 2008
- completed
- 0
- cumulative oil, bbl
- 69.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Apr 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 18, 2008
- Shut in
- —
- Plugged
- Apr 22, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson G-4-243712 | Orange Grove (4600) | Kebo Oil & Gas, Inc. | 1 | 0 | 69.8K | Oct 2008 – Apr 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cummins & Walker Oil Co., Inc.Oct 2008 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 665150-99 | Drill | Cummins & Walker Oil Co., Inc. | Jun 23, 2008 | Jul 14, 2008 | Sep 16, 2008 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-243712 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 133 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)TOP OF MIOCENE | 1,270 | -1,137 |
| Top of Het | 2,975 | -2,842 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,648 | 4,654 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 973 | 12.25 | 230 S |
| 4.5 | 5,858 | 7.875 | 685 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 2009 | Dec 23, 2008 | Yes |
| 00 | Jan 10, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-249-32531 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-249-32531 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/24932531, documented in the API reference.