TEXAS · WELLS · JIM WELLS COUNTY · API 42-249-80115 · DISTRICT 04

Seelingson Unit #0170A

Plugged

Jim Wells County · Seeligson (Zone 10) field  · Vertical

Seelingson Unit #0170A (API 42-249-80115) is a plugged well in Jim Wells County, plugged June 26, 1987, last operated by Sun Expl. & Prod. CO.-Corpus.

The RRC has issued one drilling permit, issued February 2, 1987, permitted to 5,503 ft.

Operator of record

Sun Expl. & Prod. Co.-Corpus

Based in
Houston, TX
P-5 status
Inactive (I)
Permits on file
1,290
Phone
(512) 994-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSun Expl. & Prod. Co.-Corpus
Production reportsnone
Latest permitSun Expl. & Prod. Co.-CorpusFeb 2, 1987
5,503
total depth, ft
1
permits on file
Feb 2, 1987
last permit issued
Dec 3, 1951
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 3, 1951
Shut in
—
Plugged
Jun 26, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
325945-99RecompletionSun Expl. & Prod. Co.-CorpusJan 29, 1987Feb 2, 1987—5,503

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 3, 1951Seelingson Unit G-4-67684Seeligson (Zone 10)Sun Expl. & Prod. Co.-CorpusPlugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/24980115, documented in the API reference.