TEXAS · WELLS · JOHNSON COUNTY · MIZE FAMILY LEASE · API 42-251-30274 · DISTRICT 7C

Mize Family #6H

Shut in

Johnson County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Mize Family #6H (API 42-251-30274) is a horizontal well in Johnson County operated by Tep Barnett USA LLC, completed February 1, 2005 and listed as temp abandoned on the RRC schedule, shut in March 1, 2012.

The RRC has issued one drilling permit (amended once), issued November 4, 2004, permitted to 6,924 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tep Barnett USA LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Atoka, Barnett, L. Barnett.

Its lease has reported 2.39M mcf of gas since February 2005, with no volume in the three years through April 2026.

Operator of record

TEP Barnett USA LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Apr 10, 2026
Permits on file
371
Phone
(817) 720-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTEP Barnett USA LLC
Production reportsTEP Barnett USA, LLCthrough Feb 2012
Latest permitChesapeake Operating, Inc.Nov 4, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,924
total depth, ft
2
permits on file
Nov 4, 2004
last permit issued
Feb 1, 2005
completed
0
cumulative oil, bbl
2.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2005 THROUGH Feb 2012

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 2005
Shut in
Mar 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mize Family G-13-215938Newark, East (Barnett Shale)TEP Barnett USA, LLC102.39MFeb 2005 – Feb 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hallwood Petroleum, LLCFeb 2005 → Jan 2006
  2. 2Chesapeake Operating, Inc.Feb 2006 → Feb 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
553139-98DrillChesapeake Operating, Inc.Jul 14, 2006Nov 4, 2004Nov 23, 200411,000
553139-99DrillHallwood Petroleum, LLC.Nov 3, 2004Nov 4, 2004Nov 23, 200411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 1, 2005Mize Family G-13-215938Newark East (Barnett Shale)TEP Barnett USA LLCTemp Abandoned · shut in Mar 1, 20126,924

Formation tops

As filed on W-2/G-1. Subsea from 889 ft elevation.Download CSV →

FormationMD ftSubsea
AtokaATOKA A4,904-4,015
AtokaATOKA B5,433-4,544
AtokaATOKA C5,903-5,014
Barnett6,819-5,930
L. Barnett6,821-5,932

Perforations

Perforated and open-hole intervals.

FromToType
7,40010,254Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,43012.25495 S
5.510,6518.751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 9, 2007Aug 8, 2005Yes
00May 17, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25130274, documented in the API reference.